Project details
| Official title | PROPOSED INSTALLATION OF 4 x 12T INDUCTION FURNACE TO PRODUCE 1,14,048 TPA OF BILLETS (2 STRAND BILLET CASTEER) & SLAG CRUSHER HAVING CAPACITY OF 26,400 TPA OVER AN AREA OF 16.38 AC. AT VILLAGE- PANDLOI, BLOCK-RENGALI, DISTRICT- SAMBALPUR, ODISHA |
|---|---|
| Status | Cleared for impact study |
| Status since | 14 Oct 2025 |
| Application filed | 20 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shyam Metalics and energy Limited unit 2 |
| Land area | 16.4 acres (6.6 ha) |
| Project cost | ₹127.1 crore |
| Village / locality | Pandloi |
| Taluk / tehsil | Rengali |
| District | Sambalpur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02428 |
In context
38 applications in Sambalpur since January 2022 are in the same category (Industry): 17 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 16.4 acres, this one is smaller than 68% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pandloi, Rengali, Sambalpur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project of Cold Rolling Mill for manufacturing of 1,20,000 TPA… — environmental approval granted, 450 m away
- Greenfield Project of Cold Rolling Mill for manufacturing of 1,20,000 TPA… — cleared for impact study, 450 m away
- Greenfield Steel Coil project comprising of Narrow Hot Strip Mill (6,00,000… — not approved, 700 m away
- Greenfield Secondary Metallurgical Project of Narrow Hot Strip Mill (6,00,000… — cleared for impact study, 1.3 km away
- Greenfield Secondary Metallurgical Project of Narrow Hot Strip Mill (6,00,000… — not approved, 1.3 km away
- Argon Oxygen Decarburization (AOD) in the Steel Melting Shop (SMS) to produce… — initial checks, 1.5 km away
- Argon Oxygen Decarburization (AOD) in the Steel Melting Shop (SMS) to produce… — initial checks, 1.5 km away
- Environmental Clearance as per Provision under EIA Notification No. S.O. 3250… — returned to applicant, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.