Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Jun 2026 |
| Application filed | 2 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Star Metalworks Private Limited |
| Land area | 54.2 acres (21.9 ha) |
| Project cost | ₹2,290.1 crore |
| Village / locality | Jangala |
| Taluk / tehsil | Rengali |
| District | Sambalpur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03783 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 2 Feb 2026 (this page) | Cleared for impact study | 54.2 acres | ₹2,290.1 crore |
| Early planning filed 1 Oct 2025 | Not approved | 54.2 acres | ₹2,290.1 crore |
In context
38 applications in Sambalpur since January 2022 are in the same category (Industry): 17 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 54.2 acres, this one is smaller than 55% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jangala, Rengali, Sambalpur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Secondary Metallurgical Project of Narrow Hot Strip Mill (6,00,000… — not approved, 0 m away
- Greenfield Steel Coil project comprising of Narrow Hot Strip Mill (6,00,000… — not approved, 750 m away
- Greenfield Project of Cold Rolling Mill for manufacturing of 1,20,000 TPA… — environmental approval granted, 850 m away
- Greenfield Project of Cold Rolling Mill for manufacturing of 1,20,000 TPA… — cleared for impact study, 850 m away
- 4 x 12T INDUCTION FURNACE TO PRODUCE 1,14,048 TPA OF BILLETS (2 STRAND BILLET… — cleared for impact study, 1.3 km away
- Argon Oxygen Decarburization (AOD) in the Steel Melting Shop (SMS) to produce… — initial checks, 2.8 km away
- Argon Oxygen Decarburization (AOD) in the Steel Melting Shop (SMS) to produce… — initial checks, 2.8 km away
- EC for Aluminium Smelter from 3.8LTPA to 6.8LTPA [by addition of 1LTPA… — environmental approval granted, 3.3 km away
More from Star Metalworks Private Limited in Sambalpur
All 3 Star Metalworks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.