Quick answers
What is this project?
Transfer of EC Letter No J-11015/31/2007-IA.II (M) dated 10.12.2009 granted by MoEFCC w.r.t Utkal E Coal Block (2 MTPA) located at Talcher Coalfields in Villages Nandichhod (Gopiballvpur), Gopinath Jungle, Kosala, Korada, Kundajhari Jungle and Durgapur Jungle, Tehsil Chhendipada, District Angul, Orissa by M/s. National Aluminium Company Ltd. (NALCO) to M/s. National Aluminium Company Ltd. (NALCO) is an approved mining project in Forest, Jarapada, Anugul, Odisha. The site covers 1,292.5 acres.
Who is building it?
The applicant is Nalco.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Nov 2024), as of 27 Nov 2026.
Where is it?
In Forest, Jarapada, Anugul, Odisha.
How big is it?
It has a stated cost of ₹379 crore and a site of 1,292.5 acres.
When was it filed?
The application was filed on 12 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Nov 2024 |
| Application filed | 12 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Nalco |
| Land area | 1,292.5 acres (523 ha) |
| Project cost | ₹379 crore |
| Village / locality | Forest |
| Taluk / tehsil | Jarapada |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01064 |
In context
108 applications in Anugul since January 2022 are in the same category (Mining): 50 approved, 25 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,292.5 acres, this one is larger than 62% of them.
No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.
Where it is
Forest, Jarapada, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Diversion of 299.697 Ha Forest Land Out of Total 312.697 Ha of Utkal D & E… — forest land use approved, 650 m away
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted, 650 m away
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted, 650 m away
- Amalgamation of Existing Environmental Clearances of Utkal D and E Coal Mines… — lapsed, 650 m away
- Amendment in Ec W.R.T. Amalgamation of Environmental Clearance of Utkal D and… — returned to applicant, 650 m away
- Diversion of combined Utkal- D & Utkal- E Coal Mines by M/s NALCO. — lapsed, 650 m away
- Utkal D & Utkal E Coal Block (ML Area 824.316 ha) — under environmental review, 650 m away
- Diversion of 13.0 Ha Forest Land Out of Total 312.697 Ha of Utkal D & E Combined — forest land use approved, 1 km away
More from Nalco in Anugul
- Utkal D & Utkal E Coal Block (ML Area 824.316 ha) — under environmental review
- Expansion of Aluminium Smelter Plant production capacity from 4.6 LTPA to 9.57… — lapsed
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) to 2,280 MW (Addition… — under environmental review
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive… — returned to applicant
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted