Quick answers
What is this project?
Diversion of combined Utkal- D & Utkal- E Coal Mines by M/s NALCO is a lapsed mining project in Kundajharijungle, Industrial, Anugul, Odisha. The site covers 2,036.9 acres.
Who is building it?
The applicant is Nalco.
Has it been approved?
No. The application was lapsed on 30 Jan 2024, so it is no longer under consideration.
Where is it?
In Kundajharijungle, Industrial, Anugul, Odisha.
How big is it?
It has a stated cost of ₹2,478.8 crore; a site of 2,036.9 acres and 772.7 acres (312.7 ha) of forest land.
When was it filed?
The application was filed on 30 Oct 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Jan 2024 |
| Application filed | 30 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Nalco |
| Land area | 2,036.9 acres (824.3 ha) |
| Forest land | 772.7 acres (312.7 ha) |
| Project cost | ₹2,478.8 crore |
| Village / locality | Kundajharijungle |
| Taluk / tehsil | Industrial |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04400 |
In context
108 applications in Anugul since January 2022 are in the same category (Mining): 50 approved, 25 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2,036.9 acres, this one is larger than 72% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 2,069.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Kundajharijungle, Industrial, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted, 0 m away
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted, 0 m away
- Amalgamation of Existing Environmental Clearances of Utkal D and E Coal Mines… — lapsed, 0 m away
- Amendment in Ec W.R.T. Amalgamation of Environmental Clearance of Utkal D and… — returned to applicant, 0 m away
- Utkal D & Utkal E Coal Block (ML Area 824.316 ha) — under environmental review, 0 m away
- Re-Diversion of 299.697 Ha Forest Land Out of Total 312.697 Ha of Utkal D & E… — forest land use approved, 0 m away
- Diversion of 13.0 Ha Forest Land Out of Total 312.697 Ha of Utkal D & E Combined — forest land use approved, 500 m away
- Transfer of EC Letter No J-11015/31/2007-IA.II (M) dated 10.12.2009 granted by… — environmental approval granted, 650 m away
More from Nalco in Anugul
- Utkal D & Utkal E Coal Block (ML Area 824.316 ha) — under environmental review
- Expansion of Aluminium Smelter Plant production capacity from 4.6 LTPA to 9.57… — lapsed
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) to 2,280 MW (Addition… — under environmental review
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive… — returned to applicant
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.