Quick answers
What is this project?
Extension of Validity of Amendments in Environmental Clearance Grant Orders to Liquidate Entire Stock of Old Dump Fines From Bolani Iron Ore Mines [ml Area1321.45 Ha] of M/S Steel Authority of India Limited is an approved mining project in B>L>Goda, Bolani, Kendujhar, Odisha. The site covers 3,265.4 acres.
Who is building it?
The applicant is Rourkela Steel Plant, Steel Authority of India Limited (SAIL).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Sept 2023), as of 27 Nov 2026.
Where is it?
In B>L>Goda, Bolani, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹429.3 crore and a site of 3,265.4 acres.
When was it filed?
The application was filed on 11 Jul 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Sept 2023 |
| Application filed | 11 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Rourkela Steel Plant, Steel Authority of India Limited (SAIL) |
| Land area | 3,265.4 acres (1,321.5 ha) |
| Project cost | ₹429.3 crore |
| Village / locality | B>L>Goda |
| Taluk / tehsil | Bolani |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00312 |
In context
213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3,265.4 acres, this one is larger than 92% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 9,796.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
B>L>Goda, Bolani, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement of Production Capacity of Iron Ore From 12 Mtpa to 18 Mtpa Under… — environmental approval granted, 50 m away
- Amendment in Ec of 5.10 Sq Miles Ml of Bolani Allowing Liquidation of Old Dump… — environmental approval granted, 50 m away
- Amendment in Ec of Bolani Ores Mines (6.90 Sq Miles Ml) Allowing Liquidation… — returned to applicant, 3.6 km away
- Maintenance of Safety Zone Over 55.348 Ha Area (40.60 Ha + 14.748 Ha)… — in-principle approval, conditions pending, 3.6 km away
- Laserda-Pacheri Manganese and Iron Ore Block of M/s. Thriveni Earthmovers Pvt.… — environmental approval granted, 4.6 km away
- Iron Ore beneficiation Plant over an area of 1.768 acre with throughput… — more information requested, 4.8 km away
- Iron Ore beneficiation Plant over an area of 1.768 acre with throughput… — cleared for impact study, 4.8 km away
- Preliminary Exploration for Iron Ore in Kasia West Block, Kendujhar District,… — forest land use approved, 6.6 km away
More from Rourkela Steel Plant, Steel Authority of India Limited (SAIL) in Kendujhar
- Maintenance of Safety Zone Over 55.348 Ha Area (40.60 Ha + 14.748 Ha)… — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.