Quick answers
What is this project?
Transfer of EC granted by MoEF&CC vide no. J-11011/16/2004-IA-II(I) from Tata Steel Long Product Limited to Tata Steel Limited Joda is an approved industrial project in Bh>Galpur, Joda, Kendujhar, Odisha. The site covers 309.9 acres.
Who is building it?
The applicant is Tata Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Sept 2024), as of 27 Nov 2026.
Where is it?
In Bh>Galpur, Joda, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹15 crore and a site of 309.9 acres.
When was it filed?
The application was filed on 26 Jun 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Sept 2024 |
| Application filed | 26 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Tata Steel Limited |
| Land area | 309.9 acres (125.4 ha) |
| Project cost | ₹15 crore |
| Village / locality | Bh>Galpur |
| Taluk / tehsil | Joda |
| District | Kendujhar |
| State | Odisha |
| Location from | Site area on record |
| Our reference | WID-OR-01614 |
In context
38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 309.9 acres, this one is larger than 74% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bh>Galpur, Joda, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Environment Clearance for Residential Project at Mouza – Bileipada,… — lapsed, 500 m away
- Laying of Water Pipeline from Village Kandra to Tanto for 2.4 MTPA Pallet… — lapsed, 2.8 km away
- Laying of Water Pipeline from Village Kandra to Tanto for 2.4 MTPA Pallet… — lapsed, 2.8 km away
- Laying of Water Pipeline from Kanapur Dam to Pellet Plant at Deojhar under… — initial checks, 2.9 km away
- Forest Diversion for the Pellet Plant located at Kitabeda, Deojhar and… — not approved, 3.6 km away
- Pellet Plant (10 MTPA) & Producer Gas Plant (1,80,000 m3/hr) at Barbil,… — environmental approval granted, 3.6 km away
- Raika Iron & Manganese Ore Mines of Shri Shiv Dutta Sharma over an area of… — under environmental review, 5.6 km away
- Raika Iron & Manganese Ore Mines of Shri Shiv Dutta Sharma over an area of… — not approved, 5.6 km away
More from Tata Steel Limited in Kendujhar
- Amendment in Environmental Clearance granted to Joda East Iron Mine of Tata… — under environmental review
- Enhancement in production capacity of Manganese Ore from 0.832 LTPA (0.978… — under environmental review
- Enhancement in production capacity of Manganese Ore from 0.832 LTPA (0.978… — under environmental review
- Ratification of existing EC from EIA, 1994 to 2006 regime and Production… — under environmental review
- Diversion Over 16.574 Ha of Forest Land As Per Sabik Records (As on… — more information requested
- Diversion of Balance Forest Land Over 422.048 Ha Including Safety Zone Over… — lapsed
27 Tata Steel projects in Kendujhar
All 104 Tata Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.