What is this project?
Seeking Permission of Forest Land for Non-Forest Use for Laying of Underground Slurry & Return Water Pipeline With Ofc Duct Within Right of Way [row] of National Highway (520 & 20), R&b Road & Idco and Rou Corridor for Transporting 7 Mtpa Iron Ore Concentrate From Kalmang West (Northern Part) Iron Ore Mine Under Koira & Barbil Tahasil, Dist. Sundargarh & Keonjhar to Kalinganagar Steel Plant Under Vyasanagar & Danagadi Tahasil, Dist. Jajpur is a proposed pipeline project in Ban>Jodi, Kendujhar Sadar, Kendujhar, Odisha. The site covers 101.6 acres.
Who is building it?
The applicant is Tata Steel Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Ban>Jodi, Kendujhar Sadar, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹3 lakh; a site of 101.6 acres and 2.2 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 4 Jan 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 9 Oct 2026 |
| Application filed | 4 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Tata Steel Limited |
| Land area | 101.6 acres (41.1 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Ban>Jodi |
| Taluk / tehsil | Kendujhar Sadar |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04092 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Jan 2026 (this page) | More information requested | 101.6 acres | ₹3 lakh |
| Change of use filed 8 Sept 2025 | Under forest review | 101.6 acres | ₹3 lakh |
In context
11 applications in Kendujhar since January 2022 are in the same category (Pipelines): 1 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. At 101.6 acres, this one is larger than 64% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ban>Jodi, Kendujhar Sadar, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Seeking Permission of Forest Land for Non-Forest Use for Laying of Underground… — under forest review, 0 m away
- EIA Studies for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at… — lapsed, 1.7 km away
- EIA for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at Tikarpada &… — not approved, 2.4 km away
- EIA for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at Tikarpada &… — withdrawn, 2.4 km away
- Existing Iron Ore Beneficiation (1.0 MTPA throughput) and Iron Ore… — lapsed, 3 km away
- EIA for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at Tikarpada &… — environmental approval granted, 3.8 km away
- Manganese Beneficiation Unit of throughput capacity 19,000 TPA over an area of… — under environmental review, 5 km away
- DIVERSION OF 0.399 Ha. SABIK FOREST LAND IN KEONJHAR FOREST DIVISION COMING… — lapsed, 5.4 km away
More from Tata Steel Limited in Kendujhar
- Amendment in Environmental Clearance granted to Joda East Iron Mine of Tata… — under environmental review
- Enhancement in production capacity of Manganese Ore from 0.832 LTPA (0.978… — under environmental review
- Enhancement in production capacity of Manganese Ore from 0.832 LTPA (0.978… — under environmental review
- Ratification of existing EC from EIA, 1994 to 2006 regime and Production… — under environmental review
- Diversion Over 16.574 Ha of Forest Land As Per Sabik Records (As on… — more information requested
- Diversion of Balance Forest Land Over 422.048 Ha Including Safety Zone Over… — lapsed
27 Tata Steel projects in Kendujhar