| Official title | Proposed for capacity enhancement of DRI Plant from 2x500 TPD to 2x650 TPD with change in raw material mix and WHRB from 2x15 MW to 2x20 MW with change in configuration without any changes of other plant Facilities at Village- Jiabahal, Kalunga Industrial Estate, Kalunga, Dist.- Sundargarh, Odisha by M/s. Envirocare Infrasolution Pvt. Ltd. (EIPL) |
|---|---|
| Status | Initial checks |
| Status since | 17 Feb 2025 |
| Application filed | 17 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Envirocare Infrasolution PVT. LTD. |
| Use | Industrial |
| Land area | 110.4 acres (44.7 ha) |
| Plot area | 4,46,663 m² (48,07,836 sq ft) |
| Project cost | ₹311.1 crore |
| Village / locality | Goibhanga |
| Taluk / tehsil | Brahmani Tarang |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03037 |
In context
18 applications in Sundargarh since January 2022 are in the same category (Buildings & townships): 6 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. At 110.4 acres, this one is larger than 67% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Goibhanga, Brahmani Tarang, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement of production capacity of existing Induction Furnace from 0.2 MTPA… — initial checks, 0 m away
- Expansion of DRI Plant from 0.552 MTPA to 0.783 MTPA, SMS Plant from 0.318… — lapsed, 0 m away
- EC amendment application for correction in capacities and land transfer in the… — returned to applicant, 50 m away
- Expansion of DRI plant from 3,30,000TPA to 7,26,000TPA(optimization of 2x500… — lapsed, 50 m away
- Regularization of existing rolling mill for the production of Rerolled steel… — lapsed, 800 m away
- Expansion of existing Sponge iron 1,00,000 TPA to proposed final capacity of… — lapsed, 1000 m away
- Transfer of Environment Clearance letter issued by Ministry of Environment,… — lapsed, 1 km away
- Diversion of 9.548 Ha of forest area proposed for diversion for the Project… — under forest review, 1.1 km away
More from Envirocare Infrasolution PVT. LTD. in Sundargarh
- Expansion of DRI Plant from 0.552 MTPA to 0.783 MTPA, SMS Plant from 0.318… — lapsed
- Diversion of 9.677 Ha.for construction of 3.6 MTPA Iron Ore Beneficiation… — not approved
- Proposed 5.45 MTPA (Throughput) Iron Ore Beneficiation Plant of M/s ENVIROCARE… — under environmental review
- Enhancement of production capacity of existing Induction Furnace from 0.2 MTPA… — initial checks
- Expansion of DRI plant from 3,30,000TPA to 7,26,000TPA(optimization of 2x500… — lapsed
All 6 Envirocare Infrasolution projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.