Project details
| Status | Under forest review |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 25 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Times Steel & Power Private Limited |
| Land area | 82.5 acres (33.4 ha) |
| Forest land | 23.6 acres (9.5 ha) |
| Project cost | ₹650 crore |
| Village / locality | Sanabrahmanataranga |
| Taluk / tehsil | Brahmani Tarang |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04011 |
In context
13 applications in Sundargarh since January 2022 are in the same category (Power): 6 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 82.5 acres, this one is smaller than 77% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sanabrahmanataranga, Brahmani Tarang, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Sponge iron 91,520 TPA to proposed final capacity of… — lapsed, 50 m away
- Expansion of existing Sponge iron 1,00,000 TPA to proposed final capacity of… — lapsed, 150 m away
- Proposed Greenfield Project for Installation of 3 x 12 Tonne/ Heat SMS for… — not approved, 400 m away
- Transfer of Environment Clearance letter issued by Ministry of Environment,… — lapsed, 750 m away
- Regularization of existing rolling mill for the production of Rerolled steel… — lapsed, 850 m away
- Enhancement of production capacity of existing Induction Furnace from 0.2 MTPA… — initial checks, 1.1 km away
- Proposed for capacity enhancement of DRI Plant from 2x500 TPD to 2x650 TPD… — initial checks, 1.1 km away
- Expansion of DRI Plant from 0.552 MTPA to 0.783 MTPA, SMS Plant from 0.318… — lapsed, 1.1 km away
More from Times Steel & Power Private Limited in Sundargarh
- Expansion of existing Sponge iron 1,00,000 TPA to proposed final capacity of… — lapsed
- Expansion of existing Sponge iron 91,520 TPA to proposed final capacity of… — lapsed
All 3 Times Steel & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.