Project details
| Status | Lapsed |
|---|---|
| Status since | 9 May 2026 |
| Application filed | 5 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Envirocare Infrasolution PVT. LTD. |
| Land area | 136.9 acres (55.4 ha) |
| Project cost | ₹1,582 crore |
| Village / locality | Goibhanga |
| Taluk / tehsil | Brahmani Tarang |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03432 |
In context
57 applications in Sundargarh since January 2022 are in the same category (Industry): 17 approved, 18 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 136.9 acres, this one is larger than 79% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Goibhanga, Brahmani Tarang, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement of production capacity of existing Induction Furnace from 0.2 MTPA… — initial checks, 0 m away
- Proposed for capacity enhancement of DRI Plant from 2x500 TPD to 2x650 TPD… — initial checks, 0 m away
- EC amendment application for correction in capacities and land transfer in the… — returned to applicant, 50 m away
- Expansion of DRI plant from 3,30,000TPA to 7,26,000TPA(optimization of 2x500… — lapsed, 50 m away
- Regularization of existing rolling mill for the production of Rerolled steel… — lapsed, 800 m away
- Expansion of existing Sponge iron 1,00,000 TPA to proposed final capacity of… — lapsed, 1000 m away
- Transfer of Environment Clearance letter issued by Ministry of Environment,… — lapsed, 1 km away
- Diversion of 9.548 Ha of forest area proposed for diversion for the Project… — under forest review, 1.1 km away
More from Envirocare Infrasolution PVT. LTD. in Sundargarh
- Diversion of 9.677 Ha.for construction of 3.6 MTPA Iron Ore Beneficiation… — not approved
- Proposed 5.45 MTPA (Throughput) Iron Ore Beneficiation Plant of M/s ENVIROCARE… — under environmental review
- Enhancement of production capacity of existing Induction Furnace from 0.2 MTPA… — initial checks
- Proposed for capacity enhancement of DRI Plant from 2x500 TPD to 2x650 TPD… — initial checks
- Expansion of DRI plant from 3,30,000TPA to 7,26,000TPA(optimization of 2x500… — lapsed
All 6 Envirocare Infrasolution projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.