Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Mar 2026 |
| Application filed | 29 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Mahanadi Coalfields Limited |
| Land area | 5,659.8 acres (2,290.5 ha) |
| Project cost | ₹3,756.4 crore |
| Village / locality | Gopalpur |
| Taluk / tehsil | Hemgir |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03953 |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5,659.8 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Gopalpur, Hemgir, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Hindalco Meenakshi Coal Mine: 12 MMTPA Opencast Mine in Sundargarh, Odisha (9.5 km away); Mahanadi Mines Plans a 5.26-Million-Tonne-a-Year Coal Mine in Sundargarh, Odisha (10.9 km away).
Other projects nearby
- Basundhara (West) Extension OCP — not approved, 3.1 km away
- Basundhara (West) Extension OCP of MCL — not approved, 3.1 km away
- KULDA EXPANSION OPENCAST PROJECT (21 Mty) — environmental approval granted, 4.5 km away
- KULDA EXPANSION OPENCAST PROJECT (21 Mty) — cleared for impact study, 4.5 km away
- Coal Evacuation Arrangemnt (12.5 Mty) From Kulda Garjanbahal Mines by… — initial checks, 4.6 km away
- KULDA EXPANSION OPENCAST PROJECT (21 Mty) — environmental approval granted, 4.7 km away
- KULDA EXPANSION OPENCAST PROJECT (21 Mty) — under environmental review, 4.7 km away
- Rampia & Dip Side of Rampia Coal Mines — under environmental review, 4.9 km away
More from Mahanadi Coalfields Limited in Sundargarh
- Integrated Kulda Garjanbahal Opencast Project — under environmental review
- Construction of Conveyor Belt Line From Siarmal Ocp to Barpali Bulb — in-principle approval, conditions pending
- Basundhara (West) Extension OCP of MCL — not approved
- Garjanbahal OCP Expansion — environmental approval granted
- Basundhara (West) Extension OCP — not approved
- Saradega-Barpali Railway Line (Phase-II) — not approved
8 Mahanadi Coalfields projects in Sundargarh
All 23 Mahanadi Coalfields projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.