Quick answers
What is this project?
Transfer EC of Khuntpali Ganjhiatikira Stone Quarry over an area of 3.37 Acres or 1.364 Ha is an approved mining project in Khuntapali, Bargarh Sadar, Bargarh, Odisha. The site covers 3.4 acres.
Who is building it?
The applicant is Chiranjeeb Guru.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Jan 2026), as of 27 Nov 2026.
Where is it?
In Khuntapali, Bargarh Sadar, Bargarh, Odisha.
How big is it?
It has a stated cost of ₹10 lakh and a site of 3.4 acres.
When was it filed?
The application was filed on 16 Jan 2026.
Project details
| Official title | Proposal for Transfer EC of Khuntpali Ganjhiatikira Stone Quarry over an area of 3.37 Acres or 1.364 Ha in village Khuntpali Ganjhiatikira under Bargarh Tahasil of Bargarh District, Odisha. |
|---|---|
| Status | Environmental approval granted |
| Status since | 28 Jan 2026 |
| Application filed | 16 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Chiranjeeb Guru |
| Land area | 3.4 acres (1.4 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Khuntapali |
| Taluk / tehsil | Bargarh Sadar |
| District | Bargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03961 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 16 Jan 2026 (this page) | Environmental approval granted | 3.4 acres | ₹10 lakh |
| Ownership transfer filed 10 Sept 2025 | Environmental approval granted | 3.4 acres | ₹10 lakh |
In context
57 applications in Bargarh since January 2022 are in the same category (Mining): 30 approved, 3 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.4 acres, this one is smaller than 77% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Khuntapali, Bargarh Sadar, Bargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer EC of Khuntpali Ganjhiatikira Stone Quarry over an area of 3.37 Acres… — environmental approval granted, 0 m away
- New Proposal Fresh Ec of Khuntpali, Ganjhiatikra Stone Quarry Over an Area… — under environmental review, 0 m away
- Ec of Rungunia Zeera River Sand Bed for Production Capacity of 3000 Cu.M Per… — lapsed, 2.8 km away
- Fresh EC of Rungunia Zeera River Sand Bed over an area of 12.20 Acres or 4.937… — environmental approval granted, 2.8 km away
- Environmental Clearance for Production of Country Liquor From the… — initial checks, 5.1 km away
- FRESH EC OF CHIKINIPALI STONE QUARRY OVER AN AREA OF 2.62 ACRES OR 1.060… — environmental approval granted, 8.1 km away
- Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera… — lapsed, 8.7 km away
- Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera… — lapsed, 8.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.