Quick answers
What is this project?
The Diversion of Forest Land Required for Construction of Ekalavya Model Residential School (Emrs) at Putugaon of Barbil Tahasil is a lapsed public facility in Putugaon, Joda, Kendujhar, Odisha. The site covers 12 acres.
Who is building it?
The applicant is Prabir Kumar Deo.
Has it been approved?
No. The application was lapsed on 21 Nov 2025, so it is no longer under consideration.
Where is it?
In Putugaon, Joda, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹37.8 crore; a site of 12 acres and 12 acres (4.9 ha) of forest land.
When was it filed?
The application was filed on 18 May 2024.
Project details
| Official title | Proposal for the Diversion of Forest Land Required for Construction of Ekalavya Model Residential School (Emrs) at Putugaon of Barbil Tahasil in Keonjhar District |
|---|---|
| Status | Lapsed |
| Status since | 21 Nov 2025 |
| Application filed | 18 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Public facilities |
| Applicant | Prabir Kumar Deo |
| Land area | 12 acres (4.9 ha) |
| Forest land | 12 acres (4.9 ha) |
| Project cost | ₹37.8 crore |
| Village / locality | Putugaon |
| Taluk / tehsil | Joda |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04037 |
In context
9 applications in Kendujhar since January 2022 are in the same category (Public facilities): 2 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Putugaon, Joda, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion of Forest Land Required for Construction of Ekalavya Model… — forest land use approved, 3.2 km away
- Laying of Water Pipeline from Kanapur Dam to Pellet Plant at Deojhar under… — initial checks, 6.2 km away
- Proposed Environment Clearance for Residential Project at Mouza – Bileipada,… — lapsed, 8.2 km away
- Transfer of EC granted by MoEF&CC vide no. J-11011/16/2004-IA-II(I) from Tata… — environmental approval granted, 8.7 km away
- Forest Diversion for the Pellet Plant located at Kitabeda, Deojhar and… — not approved, 8.8 km away
- Pellet Plant (10 MTPA) & Producer Gas Plant (1,80,000 m3/hr) at Barbil,… — environmental approval granted, 8.8 km away
- Expansion of Katamati Iron Mine of Tata Steel Limited from 13.5 MTPA to 16.2… — environmental approval granted, 9.7 km away
- Environment Clearance of Katamati Iron Mine of Tata Steel Limited — returned to applicant, 9.8 km away
More from Prabir Kumar Deo in Kendujhar
- The Diversion of Forest Land Required for Construction of Ekalavya Model… — more information requested
- The Diversion of Forest Land Required for Construction of Ekalavya Model… — more information requested
- The Diversion of Forest Land Required for Construction of Ekalavya Model… — forest land use approved
- The Diversion of Forest Land Required for Construction of Ekalavya Model… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.