Quick answers
What is this project?
The Diversion of Forest Land Required for Construction of Ekalavya Model Residential School (Emrs) at Badahundula of Barbil Tahasil is an approved public facility in Barhundala, Joda, Kendujhar, Odisha. The site covers 33.8 acres.
Who is building it?
The applicant is Prabir Kumar Deo.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 2 May 2026), as of 27 Nov 2026.
Where is it?
In Barhundala, Joda, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹37.8 crore; a site of 33.8 acres and 9.1 acres (3.7 ha) of forest land.
When was it filed?
The application was filed on 5 Sept 2024.
Project details
| Official title | Proposal for the Diversion of Forest Land Required for Construction of Ekalavya Model Residential School (Emrs) at Badahundula of Barbil Tahasil in Keonjhar District |
|---|---|
| Status | Forest land use approved |
| Status since | 2 May 2026 |
| Application filed | 5 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Public facilities |
| Applicant | Prabir Kumar Deo |
| Land area | 33.8 acres (13.7 ha) |
| Forest land | 9.1 acres (3.7 ha) |
| Project cost | ₹37.8 crore |
| Village / locality | Barhundala |
| Taluk / tehsil | Joda |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04146 |
In context
9 applications in Kendujhar since January 2022 are in the same category (Public facilities): 2 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barhundala, Joda, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion of Forest Land Required for Construction of Ekalavya Model… — lapsed, 3.2 km away
- Laying of Water Pipeline from Kanapur Dam to Pellet Plant at Deojhar under… — initial checks, 5 km away
- Forest Diversion for the Pellet Plant located at Kitabeda, Deojhar and… — not approved, 5.8 km away
- Pellet Plant (10 MTPA) & Producer Gas Plant (1,80,000 m3/hr) at Barbil,… — environmental approval granted, 5.8 km away
- Proposed Environment Clearance for Residential Project at Mouza – Bileipada,… — lapsed, 6.1 km away
- Expansion of Katamati Iron Mine of Tata Steel Limited from 13.5 MTPA to 16.2… — environmental approval granted, 6.5 km away
- Transfer of EC granted by MoEF&CC vide no. J-11011/16/2004-IA-II(I) from Tata… — environmental approval granted, 6.6 km away
- Environment Clearance of Katamati Iron Mine of Tata Steel Limited — returned to applicant, 6.6 km away
More from Prabir Kumar Deo in Kendujhar
- The Diversion of Forest Land Required for Construction of Ekalavya Model… — more information requested
- The Diversion of Forest Land Required for Construction of Ekalavya Model… — more information requested
- The Diversion of Forest Land Required for Construction of Ekalavya Model… — forest land use approved
- The Diversion of Forest Land Required for Construction of Ekalavya Model… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.