What is Developing? Open the mapMap

More information requestedMining · Kendujhar, Odisha

Transfer of Stage-II (final) approval accorded by MOEF&CC, Govt. of India vide F.No. 8-13/2022-FC, dated 30.07.2025 under section 2 (1)(ii) of Van (Sanrakshan Evam Samvardhan) Adhiniyam, 1980 over 42.608 ha of forest land (16.658 ha in Keonjhar Forest Division and 25.950 ha in Bonai Forest Division) for non-forestry use within Kalamang West (Northern Part) Iron ore Block

Transfer of Stage-II (final) approval accorded by MOEF&CC, Govt. of India vide F.No. 8-13/2022-FC, dated 30.07.2025 under section 2 (1)(ii) of Van (Sanrakshan Evam Samvardhan) Adhiniyam, 1980 over 42.608 ha of forest land (16.658 ha in Keonjhar Forest Division and 25.950 ha in Bonai Forest Division) for non-forestry use within Kalamang West (Northern Part) Iron ore Block is a proposed mining project in Gandhalpada, Rugudi, Kendujhar, Odisha. The site covers 229.5 acres. Its stated project cost is ₹205 crore. As of 27 Nov 2026, its status is “More information requested” (since 5 Sept 2026).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Transfer of Stage-II (final) approval accorded by MOEF&CC, Govt. of India vide F.No. 8-13/2022-FC, dated 30.07.2025 under section 2 (1)(ii) of Van (Sanrakshan Evam Samvardhan) Adhiniyam, 1980 over 42.608 ha of forest land (16.658 ha in Keonjhar Forest Division and 25.950 ha in Bonai Forest Division) for non-forestry use within Kalamang West (Northern Part) Iron ore Block is a proposed mining project in Gandhalpada, Rugudi, Kendujhar, Odisha. The site covers 229.5 acres.

Who is building it?

The applicant is Tata Steel Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Gandhalpada, Rugudi, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹205 crore; a site of 229.5 acres and 229.5 acres (92.9 ha) of forest land.

When was it filed?

The application was filed on 24 Dec 2025.

Project details

Official titleTransfer of Stage-II (final) approval accorded by MOEF&CC, Govt. of India vide F.No. 8-13/2022-FC, dated 30.07.2025 under section 2 (1)(ii) of Van (Sanrakshan Evam Samvardhan) Adhiniyam, 1980 over 42.608 ha of forest land (16.658 ha in Keonjhar Forest Division and 25.950 ha in Bonai Forest Division) for non-forestry use within Kalamang West (Northern Part) Iron ore Block in Keonjhar and Sundargarh District, Odisha from M/s Tata Steel BSL Limited to M/s Tata Steel Limited
StatusMore information requested
Status since5 Sept 2026
Application filed24 Dec 2025
Approval soughtForest land use
Application typeOwnership transfer
SectorMining
ApplicantTata Steel Limited
Land area229.5 acres (92.9 ha)
Forest land229.5 acres (92.9 ha)
Project cost₹205 crore
Village / localityGandhalpada
Taluk / tehsilRugudi
DistrictKendujhar
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-04094

In context

213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 229.5 acres, this one is larger than 66% of them.

No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.

Where it is

Gandhalpada, Rugudi, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Tata Steel Limited in Kendujhar

27 Tata Steel projects in Kendujhar
All 104 Tata Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.