What is this project?
Forest Diversion Proposal over 4.0834 ha. Forest Land for construction of approach road for Transportation of Materials to and from Plant area of M/s. Epsilon Carbon Ashoka Pvt. Ltd is a proposed building project in Shreepura, Badmal, Jharsuguda, Odisha. The site covers 77.8 acres.
Who is building it?
The applicant is Epsilon Carbon Ashoka Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Shreepura, Badmal, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹2.5 crore; a site of 77.8 acres and 10.1 acres (4.1 ha) of forest land.
When was it filed?
The application was filed on 4 Dec 2025.
Project details
| Official title | Forest Diversion Proposal over 4.0834 ha. Forest Land for construction of approach road for Transportation of Materials to and from Plant area of M/s. Epsilon Carbon Ashoka Pvt. Ltd. in village Sripura under Jharsuguda Forest Division in Jharsuguda District, Odisha |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 25 Nov 2026 |
| Application filed | 4 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Epsilon Carbon Ashoka Private Limited |
| Land area | 77.8 acres (31.5 ha) |
| Forest land | 10.1 acres (4.1 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Shreepura |
| Taluk / tehsil | Badmal |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04254 |
In context
11 applications in Jharsuguda since January 2022 are in the same category (Buildings & townships): 1 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. At 77.8 acres, this one is smaller than 73% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shreepura, Badmal, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (6.4 km away).
Other projects nearby
- Spur-line to M/s JSW BPSL of Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL)… — lapsed, 500 m away
- Expansion of existing 60,000 TPA of Sponge Iron from DRI Kiln to Proposed… — lapsed, 950 m away
- Transfer of EC of Sripura Sand Bed-B over an area 12.00 Acres or 4.86 Ha — environmental approval granted, 1.8 km away
- Sripura Sand Bed-B — not approved, 2 km away
- Sripura -C Sand Quarrry, over 6.09 ha. or 15.01 acres — cleared for impact study, 2.5 km away
- 1X800MW NLC Talabira Thermal Power Project (NTTPP) Phase-II — cleared for impact study, 3.8 km away
- Katikela Sand Bed-D over an area of 6.07 Ha. at Khata No.- 224. Plot No.-… — under environmental review, 4.1 km away
- Expansion of Aluminium Smelter Production Capacity from 16 LTPA to 18 LTPA,… — lapsed, 4.4 km away
More from Epsilon Carbon Ashoka Private Limited in Jharsuguda
- "Proposed Integrated Carbon Complex having 1. Coal Tar Distillation (CTD) Unit… — environmental approval granted
All 3 Epsilon Carbon Ashoka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.