Quick answers
What is 1X800MW NLC Talabira Thermal Power Project (NTTPP) Phase-II?
1X800MW NLC Talabira Thermal Power Project (NTTPP) Phase-II is a proposed power project in Hirama, Badmal, Jharsuguda, Odisha. The site covers 461.7 acres.
Who is building it?
The applicant is Nlc India Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Jul 2025), as of 27 Nov 2026.
Where is it?
In Hirama, Badmal, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹7,178.6 crore and a site of 461.7 acres.
When was it filed?
The application was filed on 30 Oct 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Jul 2025 |
| Application filed | 30 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | Nlc India Limited |
| Land area | 461.7 acres (186.9 ha) |
| Project cost | ₹7,178.6 crore |
| Village / locality | Hirama |
| Taluk / tehsil | Badmal |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01552 |
In context
19 applications in Jharsuguda since January 2022 are in the same category (Power): 8 approved, 8 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 461.7 acres, this one is smaller than 63% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hirama, Badmal, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (2.7 km away).
Other projects nearby
- Talabira II & III Opencast Coal Mine — environmental approval granted, 2.7 km away
- Talabira II & III Open Cast Mine — returned to applicant, 2.7 km away
- Proposed Integrated Steel Plant of 0.528 MTPA Crude Steel in 103.581 Ha — cleared for impact study, 2.9 km away
- Iron Ore Pellet Plant of production capacity of 2 X 0.6 MTPA by Konark Ispat… — cleared for impact study, 3 km away
- Forest Diversion Proposal over 20.950Ac./8.478Ha. Forest Land for the… — under forest review, 3.4 km away
- "Proposed Integrated Carbon Complex having 1. Coal Tar Distillation (CTD) Unit… — environmental approval granted, 3.5 km away
- Forest Diversion Proposal over 4.0834 ha. Forest Land for construction of… — in-principle approval, conditions pending, 3.8 km away
- Expansion of existing 60,000 TPA of Sponge Iron from DRI Kiln to Proposed… — lapsed, 4.1 km away
More from Nlc India Limited in Jharsuguda
- Forest Diversion Proposal over 20.950Ac./8.478Ha. Forest Land for the… — under forest review
- Talabira II & III Opencast Coal Mine — environmental approval granted
- Talabira II & III Open Cast Mine — returned to applicant
4 Nlc India projects in Jharsuguda
All 14 Nlc India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.