One of 2 filings for this project. The project's main page, with every filing and where each stands: For obtaining Forest Clearance for setting up Integrated Advanced Specialty Steel and…
Project details
| Status | Not approved |
|---|---|
| Status since | 5 May 2026 |
| Application filed | 6 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Kalyani Steels LTD |
| Land area | 555.3 acres (224.7 ha) |
| Forest land | 148.8 acres (60.2 ha) |
| Project cost | ₹11,058 crore |
| Village / locality | Talabarakot |
| Taluk / tehsil | Dhenkanal Sadar |
| District | Dhenkanal |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04295 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Mar 2025 | In-principle approval, conditions pending | 2,265.2 acres | ₹11,058 crore |
| New project filed 6 Sept 2024 (this page) | Not approved | 555.3 acres | ₹11,058 crore |
In context
36 applications in Dhenkanal since January 2022 are in the same category (Industry): 8 approved, 18 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 555.3 acres, this one is larger than 61% of them.
Where it is
Talabarakot, Dhenkanal Sadar, Dhenkanal, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Proposal for Fresh Ec of Sankarpur Morrum Quarry No-Ii Over an Area 4.91… — under environmental review, 6 km away
- Proposed for change in production capacity from 100 KLPD Ethanol and ENA… — initial checks, 7.1 km away
- Proposed Grain Based Distillary unit (100 KLPD) with Co-generating Power plant… — environmental approval granted, 7.2 km away
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — under environmental review, 9 km away
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — cleared for impact study, 9 km away
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — returned to applicant, 9 km away
- Nochapali Laterite Stone Quarry Over an Area of 1.16acres Or 0.47 Ha Is — environmental approval granted, 10.2 km away
- For obtaining Forest Clearance for setting up Integrated Advanced Specialty… — in-principle approval, conditions pending, 10.8 km away
More from Kalyani Steels LTD in Dhenkanal
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — under environmental review
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — cleared for impact study
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — returned to applicant
All 5 Kalyani Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.