Quick answers
What is this project?
Preliminary Exploration for Iron Ore in Kasia West Block, Kendujhar District, Odisha (G-3) is an approved survey and exploration project in Kolhabarpada, Barbil, Kendujhar, Odisha. The site covers 485.9 acres.
Who is building it?
The applicant is Geological Survey of INDIA, Ministry of Mines.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Dec 2025), as of 27 Nov 2026.
Where is it?
In Kolhabarpada, Barbil, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹58 lakh; a site of 485.9 acres and 398.7 acres (161.3 ha) of forest land.
When was it filed?
The application was filed on 1 Sept 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 23 Dec 2025 |
| Application filed | 1 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Survey & exploration |
| Applicant | Geological Survey of INDIA, Ministry of Mines |
| Land area | 485.9 acres (196.7 ha) |
| Forest land | 398.7 acres (161.3 ha) |
| Project cost | ₹58 lakh |
| Village / locality | Kolhabarpada |
| Taluk / tehsil | Barbil |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04561 |
In context
7 applications in Kendujhar since January 2022 are in the same category (Survey & exploration): 6 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kolhabarpada, Barbil, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kasia Iron Ore & Dolomite Mining and Beneficiation Plant Project — environmental approval granted, 850 m away
- Diversion of 3.999 Ha. Non-Forest Land Recorded As Forest As on 25.10.1980… — lapsed, 850 m away
- Proposed 132 KV Transmission Line from 132/33 KV Grid substation at Barbil to… — lapsed, 1.5 km away
- Proposed 132 KV Transmission Line from 132/33 KV Grid substation at Barbil to… — lapsed, 1.6 km away
- Proposed 2.4 MTPA (1 x 2.4 MTPA) Pellet Plant by M/s Narbheram Power and Steel… — cleared for impact study, 2.4 km away
- Diversion of 7.576 Ha forest land involved in the ML area of Roida II Iron Ore… — lapsed, 2.8 km away
- Diversion of 7.576 Ha (4.435 Ha. for mining and ancillary activities and… — lapsed, 2.9 km away
- Transfer of Environment Clearance for Production of 3.5 Mtpa Iron Ore From… — environmental approval granted, 2.9 km away
More from Geological Survey of INDIA, Ministry of Mines in Kendujhar
- Critical Mineral Assessment Programme (CMAP) for for assessing the… — forest land use approved
- Preliminary Exploration for Bauxite and Associated Critical Elements in… — forest land use approved
- Preliminary Exploration for Bauxite and Associated Critical and Trace Elements… — forest land use approved
- Critical Mineral Assessment Programme (CMAP) for assessing the potentiality of… — forest land use approved
- Critical Mineral Assessment Programme ( Cmap) for Assessing the Potentiality… — forest land use approved
- Preliminary exploration for Manganese and Iron ore in Kundrupani Block,… — forest land use approved
8 Geological Survey of India (GSI) projects in Kendujhar
All 170 Geological Survey of India (GSI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.