Quick answers
What is this project?
Proposed Industrial Unit for Manufacturing of Plasticizers and Chlorinated Paraffin Wax by M/s Payal Plastichem Pvt. Ltd is a withdrawn industrial project in Khadauli, Rajpura, Patiala, Punjab. The site covers 6.1 acres.
Who is building it?
The applicant is Payal Plastichem Private Limited.
Has it been approved?
No. The application was withdrawn on 15 Apr 2025, so it is no longer under consideration.
Where is it?
In Khadauli, Rajpura, Patiala, Punjab.
How big is it?
It has a stated cost of ₹20 crore and a site of 6.1 acres.
When was it filed?
The application was filed on 11 Apr 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Industrial Unit for Manufacturing of Plasticizers and Chlorinated Paraffin Wax…
Project details
| Official title | Proposed Industrial Unit for Manufacturing of Plasticizers and Chlorinated Paraffin Wax in the revenue estate of Village Khadauli, Rajpura, District Patiala, Punjab by M/s Payal Plastichem Pvt. Ltd. |
|---|---|
| Status | Withdrawn |
| Status since | 15 Apr 2025 |
| Application filed | 11 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Payal Plastichem Private Limited |
| Land area | 6.1 acres (2.5 ha) |
| Project cost | ₹20 crore |
| Village / locality | Khadauli |
| Taluk / tehsil | Rajpura |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00558 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Apr 2025 (this page) | Withdrawn | 6.1 acres | ₹20 crore |
| Early planning filed 4 Jul 2024 | Cleared for impact study | 6.1 acres | ₹20 crore |
In context
45 applications in Patiala since January 2022 are in the same category (Industry): 29 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.1 acres, this one is smaller than 67% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khadauli, Rajpura, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial Unit for Manufacturing of Plasticizers and Chlorinated… — cleared for impact study, 0 m away
- Proposed Industrial Unit for Manufacturing of Chlorinated Methyl Fatty Ester… — environmental approval granted, 200 m away
- Industrial project by M/s Shivtek Spechemi Industries Ltd. — cleared for impact study, 200 m away
- Industrial project by M/s Shivtek Spechemi Industries Limited — returned to applicant, 200 m away
- Proposed Industrial Unit for Manufacturing of Chlorinated Methyl Fatty Ester… — cleared for impact study, 200 m away
- New Chemical Manufacturing unit by M/s Chemoro Industries Limited — environmental approval granted, 300 m away
- Expansion of the Existing Chloro Alkali Plant for Increase in the Production… — environmental approval granted, 350 m away
- Expansion of the Existing Chloro Alkali Plant for Increase in the Production… — environmental approval granted, 350 m away
All 4 Payal Plastichem projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.