Quick answers
What is this project?
The Proposed Project Involves Mining of Minor Mineral I.E. Sand From the Bed of River Sutlej (Po_ld_ld2_st_35_36) is a lapsed mining project in Bunt, Ludhiana (East), Ludhiana, Punjab. The site covers 7,113 acres.
Who is building it?
The applicant is Executive Engineer Cum District Mining Officer Ludhiana.
Has it been approved?
No. The application was lapsed on 2 Mar 2026, so it is no longer under consideration.
Where is it?
In Bunt, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹26 lakh and a site of 7,113 acres.
When was it filed?
The application was filed on 28 Feb 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: The Proposed Project Involves Mining of Minor Mineral I.E. Sand From the Bed of River…
Project details
| Official title | The Proposed Project Involves Mining of Minor Mineral I.E. Sand From the Bed of River Sutlej (Po_ld_ld2_st_35_36) in Village-Boont, Tehsil & District- Ludhiana, State Punjab From an Area of 25.36 Ha, With Avg. Production Capacity 352034 Tpa Proposed by Executive Engineer/Ludhiana, Drainage Cum Mines and Geology, Wrd, Punjab. |
|---|---|
| Status | Lapsed |
| Status since | 2 Mar 2026 |
| Application filed | 28 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Executive Engineer Cum District Mining Officer Ludhiana |
| Land area | 7,113 acres (2,878.5 ha) |
| Project cost | ₹26 lakh |
| Village / locality | Bunt |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00641 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Feb 2024 (this page) | Lapsed | 7,113 acres | ₹26 lakh |
| Early planning filed 23 Aug 2023 | Cleared for impact study | 7,113 acres | ₹26 lakh |
In context
65 applications in Ludhiana since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7,113 acres, this one is larger than 97% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bunt, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Proposed Project Involves Mining of Minor Mineral I.E. Sand From the Bed… — cleared for impact study, 0 m away
- Proposed 0.75 Million Tonnes Per Annum (MTPA) Crude Steel Production Through… — environmental approval granted, 864.4 km away
- Proposed 0.75 Million Tonnes Per Annum (MTPA) Crude Steel Production Through… — cleared for impact study, 906.2 km away
- Expansion in the existing Steel Manufacturing Unit M/s Steeltech Alloys… — environmental approval granted, 911.7 km away
- Expansion in the existing Steel Manufacturing Unit M/s Steeltech Alloys… — cleared for impact study, 911.7 km away
- Steel Manufacturing Unit namely M/s Varun Steel Castings Pvt. Ltd — environmental approval granted, 911.7 km away
- Amendment in the Ec Vide No. Decc/Seiaa/2020/1601 Dated 20.05.2020 and Ec Vide… — environmental approval granted, 911.7 km away
- Expansion in existing steel manufacturing unit having by M/s P.V. Industries — lapsed, 911.9 km away
More from Executive Engineer Cum District Mining Officer Ludhiana in Ludhiana
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — environmental approval granted
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed
- Desilting of River Sutlej in between RD 1000-11760 of 4-L Bandh of River… — lapsed
- Desilting of River Sutlej by Abadies and Agricultural Land — not approved
- Desilting of River Sutlej in between RD 38730-40980 of 4-L Bandh of River… — lapsed
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed
40 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects in Ludhiana
All 43 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.