Environmental approval grantedIndustry · Ludhiana, Punjab

New Steel manufacturing unit by installing 02 no. of Electric Arc Furnace of capacity 40 TPH each, 01 No. of LRF of having capacity 40 TPH, 01 no. of VD, 01 no. of Rolling Mill

New Steel manufacturing unit by installing 02 no. of Electric Arc Furnace of capacity 40 TPH each, 01 No. of LRF of having capacity 40 TPH, 01 no. of VD, 01 no. of Rolling Mill is an approved industrial project in Ghulal, Samrala, Ludhiana, Punjab. The site covers 13.6 acres. Its stated project cost is ₹307 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 15 Jan 2026).

See it on the live map All projects in Ludhiana

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

New Steel manufacturing unit by installing 02 no. of Electric Arc Furnace of capacity 40 TPH each, 01 No. of LRF of having capacity 40 TPH, 01 no. of VD, 01 no. of Rolling Mill is an approved industrial project in Ghulal, Samrala, Ludhiana, Punjab. The site covers 13.6 acres.

Who is building it?

The applicant is Vsb Steel India Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 15 Jan 2026), as of 27 Nov 2026.

Where is it?

In Ghulal, Samrala, Ludhiana, Punjab.

How big is it?

It has a stated cost of ₹307 crore and a site of 13.6 acres.

When was it filed?

The application was filed on 19 Aug 2025.

Project details

Official titleNew Steel manufacturing unit by installing 02 no. of Electric Arc Furnace of capacity 40 TPH each, 01 No. of LRF of having capacity 40 TPH, 01 no. of VD, 01 no. of Rolling Mill along with Concast and 01 No. of Duel fuel Fired Heating Furnace having production capacity 6,72,000 TPA of Ingots/Billets, Alloy Steel Wire Rod, Round, Bars & HR/CR Coil at Village-Ghulal, Chandigarh Road, District-Ludhiana, Punjab by M/s VSB Steel India Private Limited.
StatusEnvironmental approval granted
Status since15 Jan 2026
Application filed19 Aug 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantVsb Steel India Private Limited
Land area13.6 acres (5.5 ha)
Project cost₹307 crore
Village / localityGhulal
Taluk / tehsilSamrala
DistrictLudhiana
StatePunjab
Location fromSite area on record
Our referenceWID-PB-00960

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Aug 2025 (this page)Environmental approval granted13.6 acres₹307 crore
Early planning filed 2 May 2024Cleared for impact study13.6 acres₹307 crore

In context

98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 13.6 acres, this one is larger than 84% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ghulal, Samrala, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vsb Steel India Private Limited in Ludhiana

All 3 Vsb Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.