Quick answers
What is this project?
Diversion of 0.045 Hec. Forest Land Permission for Laying Underground Pipeline to Provide Lift Irrigation Facilities to Village Poonia in Distt Ludhiana From Sirhind Canal Rd 142000 Right Side Ludhiana Forest Division (Total Length= 75 Mtr) is an approved pipeline project in Punian, Samrala, Ludhiana, Punjab. The site covers 0.1 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Apr 2026), as of 27 Nov 2026.
Where is it?
In Punian, Samrala, Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹1.2 crore; a site of 0.1 acres and 450 m² of forest land.
When was it filed?
The application was filed on 17 Aug 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Apr 2026 |
| Application filed | 17 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Department of Irrigation |
| Land area | 500 m² |
| Forest land | 450 m² |
| Project cost | ₹1.2 crore |
| Village / locality | Punian |
| Taluk / tehsil | Samrala |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01846 |
In context
8 applications in Ludhiana since January 2022 are in the same category (Pipelines): 1 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Punian, Samrala, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed, 1.5 km away
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed, 1.5 km away
- New Steel manufacturing unit by installing 02 no. of Electric Arc Furnace of… — environmental approval granted, 2.9 km away
- New Steel manufacturing unit by installing 02 no. of Electric Arc Furnace of… — cleared for impact study, 3 km away
- New Steel manufacturing unit by installing 02 no. of Electric Arc Furnace of… — environmental approval granted, 3 km away
- Laying Ofc Length 24905 Meter in Forest Division Ludhiana — lapsed, 3.2 km away
- Godown Building of "M/S S. T. Cottex Exports Private Limited" — forest land use approved, 3.8 km away
- Diversion of 0.0196 Ha. of Forest Land for Approach Road to Proposed Retail… — forest land use approved, 3.8 km away
More from Department of Irrigation in Ludhiana
- Diversion of 0.028 Ha Forest Land Permission for Laying Underground Pipeline… — more information requested
- Project Estimate for concrete lining of 4R Distributary from RD 0TO 18125… — forest land use approved
- Project Estimate for modernization/concrete Lining of 2-R Distributary System — forest land use approved
- Project Estimate for Concrete Lining of 3-R Distributary System Off taking at… — forest land use approved
5 Department of Irrigation, Punjab projects in Ludhiana
All 157 Department of Irrigation, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.