Quick answers
What is Laying Ofc Length 24905 Meter in Forest Division Ludhiana?
Laying Ofc Length 24905 Meter in Forest Division Ludhiana is a lapsed telecom project in Jandiali, Ludhiana (East), Ludhiana, Punjab. The site covers 2.8 acres.
Who is building it?
The applicant is Reliance Jio Infocomm Limited.
Has it been approved?
No. The application was lapsed on 31 Jan 2025, so it is no longer under consideration.
Where is it?
In Jandiali, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹37 lakh; a site of 2.8 acres and 2.8 acres (1.1 ha) of forest land.
When was it filed?
The application was filed on 7 Nov 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 31 Jan 2025 |
| Application filed | 7 Nov 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Reliance Jio Infocomm Limited |
| Land area | 2.8 acres (1.1 ha) |
| Forest land | 2.8 acres (1.1 ha) |
| Project cost | ₹37 lakh |
| Village / locality | Jandiali |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01548 |
In context
5 applications in Ludhiana since January 2022 are in the same category (Telecom): 1 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jandiali, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Steel manufacturing unit by installing 02 no. of Electric Arc Furnace of… — environmental approval granted, 1.2 km away
- New Steel manufacturing unit by installing 02 no. of Electric Arc Furnace of… — cleared for impact study, 1.2 km away
- New Steel manufacturing unit by installing 02 no. of Electric Arc Furnace of… — environmental approval granted, 1.2 km away
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed, 2.3 km away
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed, 2.3 km away
- Diversion of 0.045 Hec. Forest Land Permission for Laying Underground Pipeline… — forest land use approved, 3.2 km away
- USE OF 0.10276 HECTARE OF FOREST LAND IN FAVOUR OF M/S BHARAT SANCHAR NIGAM… — more information requested, 4.1 km away
- Road project by M/S Grande Green Farms Pvt. Ltd., at Village Kubba, Tehsil… — lapsed, 4.4 km away
More from Reliance Jio Infocomm Limited in Ludhiana
- Diversion of 0.7084 Ha. of Forest Land for Laying of Optical Fiber Cable From… — forest land use approved
- Diversion of 0.3412 Ha. of Forest Land for Laying of Optical Fiber Cable From… — lapsed
3 Reliance Jio Infocomm (Jio) projects in Ludhiana
All 222 Reliance Jio Infocomm (Jio) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.