Quick answers
What is this project?
Expansion of Cement Production Capacity (3.0 Million TPA to 6.0 Million TPA) of Clinker Grinding Unit is a proposed industrial project in Haripur, Fatehgarh Sahib, Punjab. The site covers 51.9 acres.
Who is building it?
The applicant is M/s. UltraTech Cement Ltd..
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Haripur, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹950 crore and a site of 51.9 acres.
When was it filed?
The application was filed on 5 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Cement Production Capacity (3.0 Million TPA to 6.0 Million TPA) of Clinker…
Project details
| Official title | Expansion of Cement Production Capacity (3.0 Million TPA to 6.0 Million TPA) of Clinker Grinding Unit at Village: Sadhroar, Tehsil: Rajpura, District: Patiala and Village: Haripur, Tehsil & District: Fatehgarh Sahib (Punjab) by M/s. UltraTech Cement Limited (Unit: Rajpura Cement Works) |
|---|---|
| Status | More information requested |
| Status since | 18 Sept 2026 |
| Application filed | 5 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | M/s. UltraTech Cement Ltd. |
| Land area | 51.9 acres (21 ha) |
| Project cost | ₹950 crore |
| Village / locality | Haripur |
| Taluk / tehsil | Fatehgarh Sahib |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00982 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 5 Aug 2026 (this page) | More information requested | 51.9 acres | ₹950 crore |
| Early planning filed 13 Jun 2023 | Cleared for impact study | 51.9 acres | ₹950 crore |
In context
85 applications in Fatehgarh Sahib since January 2022 are in the same category (Industry): 70 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 51.9 acres, this one is larger than 96% of them.
Where it is
Haripur, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Cement Production Capacity (3.0 Million TPA to 6.0 Million TPA)… — cleared for impact study, 0 m away
- Dolphin Industrial Park (Agro-Based) by M/s Dolphin Mercantile Pvt. Ltd — environmental approval granted, 8.5 km away
- Permission for construction of approach Access Retail Outlet Of Bharat… — forest land use approved, 10.1 km away
- Permission for construction of approach Access Retail Outlet Of Bharat… — lapsed, 10.1 km away
- Permission for construction of approach Access to Proposed GLF City… — forest land use approved, 10.1 km away
- Permission for construction of approach Access to Proposed Colony by M/S ALC… — forest land use approved, 10.7 km away
- Permission for construction of approach Access to Proposed Industrial Flour… — forest land use approved, 11.1 km away
- Approach road for proposed Retail outlet by BPCL — forest land use approved, 11.2 km away
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.