Dolphin Industrial Park (Agro-Based) by M/s Dolphin Mercantile Pvt. Ltd is an approved building project in Jiwanpura, Fatehgarh Sahib, Punjab. The site covers 23.4 acres.
Who is building it?
The applicant is Dolphin Mercantile Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Apr 2023), as of 27 Nov 2026.
Where is it?
In Jiwanpura, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹10.7 crore and a site of 23.4 acres.
When was it filed?
The application was filed on 5 Apr 2023.
Project details
| Official title | Dolphin Industrial Park (Agro-Based) at Village Jiwanpura, Tehsil and Distt. Fatehgarh Sahib, Punjab by M/s Dolphin Mercantile Pvt. Ltd |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Apr 2023 |
| Application filed | 5 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dolphin Mercantile Private Limited |
| Land area | 23.4 acres (9.5 ha) |
| Project cost | ₹10.7 crore |
| Village / locality | Jiwanpura |
| Taluk / tehsil | Fatehgarh Sahib |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00266 |
In context
17 applications in Fatehgarh Sahib since January 2022 are in the same category (Buildings & townships): 12 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 23.4 acres, this one is larger than 76% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jiwanpura, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Approach road for proposed Retail outlet by BPCL — forest land use approved, 4 km away
- Permission for diversion of Forest Land for construction of Entry & Exit… — forest land use approved, 5.6 km away
- Permission for diversion of Forest Land for construction of Entry & Exit… — lapsed, 5.6 km away
- Permission for construction of approach Access to Proposed Industrial Flour… — forest land use approved, 5.8 km away
- Permission for construction of Over Bridge on Narwana Branch Canal (N.B.C) RD… — lapsed, 6.4 km away
- Metro Resort — lapsed, 7.7 km away
- Expansion of Cement Production Capacity (3.0 Million TPA to 6.0 Million TPA)… — more information requested, 8.5 km away
- Expansion of Cement Production Capacity (3.0 Million TPA to 6.0 Million TPA)… — cleared for impact study, 8.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.