Quick answers
What is Desilting of River Sutlej?
Desilting of River Sutlej is a lapsed building project in Auliapur, Balachaur, Shahid Bhagat Singh Nagar, Punjab. The site covers 4.4 acres.
Who is building it?
The applicant is Executive Engineer-Cum- District Mining Officer.
Has it been approved?
No. The application was lapsed on 14 Feb 2026, so it is no longer under consideration.
Where is it?
In Auliapur, Balachaur, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹33 lakh; a site of 4.4 acres and 4.4 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 19 Dec 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Desilting of River Sutlej
Project details
| Official title | Desilting of River Sutlej in Village Auliapur, Opp. (Auliapur Complex) to Protect Nearby Abadies & Agricultural Land at Right Side of Sutlej River. (Rd 65000 to Rd 66000) |
|---|---|
| Status | Lapsed |
| Status since | 14 Feb 2026 |
| Application filed | 19 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer-Cum- District Mining Officer |
| Land area | 4.4 acres (1.8 ha) |
| Forest land | 4.4 acres (1.8 ha) |
| Project cost | ₹33 lakh |
| Village / locality | Auliapur |
| Taluk / tehsil | Balachaur |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02313 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Mar 2026 | Lapsed | 4.4 acres | ₹33 lakh |
| New project filed 17 Jan 2026 | Lapsed | 4.4 acres | ₹33 lakh |
| New project filed 19 Dec 2025 (this page) | Lapsed | 4.4 acres | ₹33 lakh |
In context
5 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Buildings & townships): 0 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Auliapur, Balachaur, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Desilting of River Sutlej — lapsed, 0 m away
- Desilting of River Sutlej — lapsed, 0 m away
- Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed — more information requested, 1.6 km away
- Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed — cleared for impact study, 1.6 km away
- Proposed Sand Mining (boulder, gravel, sand) project (site no. PO_SN_BL_ST_22)… — lapsed, 1.6 km away
- Proposed Sand mining project, Village- Auliapur District- SBS Nagar State… — lapsed, 2 km away
- Proposed Sand mining project, Village- Auliapur District- SBS Nagar State… — cleared for impact study, 2 km away
- Desilting in Longitudinal Length Opposite Shergarh and Dhulewal Complex Rd… — lapsed, 2.3 km away
More from Executive Engineer-Cum- District Mining Officer in Shahid Bhagat Singh Nagar
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — more information requested
- Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed — more information requested
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — cleared for impact study
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.