What is Developing? Open the mapMap

Cleared for impact studyMining · Pathankot, Punjab

Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining lease area of 0.85 hectares (Total Cluster Area- 49.34 Ha, falling in Khasra Nos. 12//10/2, 9/2, 10/1, 2/2

Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining lease area of 0.85 hectares (Total Cluster Area- 49.34 Ha, falling in Khasra Nos. 12//10/2, 9/2, 10/1, 2/2 is a proposed mining project in Chak Gajju, Pathankot, Punjab. The site covers 2.1 acres. Its stated project cost is ₹25 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Jun 2026).

See it on the live map All projects in Pathankot

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining lease area of 0.85 hectares (Total Cluster Area- 49.34 Ha, falling in Khasra Nos. 12//10/2, 9/2, 10/1, 2/2 is a proposed mining project in Chak Gajju, Pathankot, Punjab. The site covers 2.1 acres.

Who is building it?

The applicant is Guru Mehr Constructions.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 4 Jun 2026), as of 27 Nov 2026.

Where is it?

In Chak Gajju, Pathankot, Punjab.

How big is it?

It has a stated cost of ₹25 lakh and a site of 2.1 acres.

When was it filed?

The application was filed on 28 May 2026.

Project details

Official titleMining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining lease area of 0.85 hectares (Total Cluster Area- 49.34 Ha, falling in Khasra Nos. 12//10/2, 9/2, 10/1, 2/2 in Village- Chak Gajju, (CRMS-25), Hadbast No. 58, Village Chak Gajju, Tehsil- Narot Jaimal Singh, District- Pathankot, State- Punjab by Shri Darshan Singh, Partner M/s Guru Mehr Constructions, Village Akhwara, Tehsil Narot Jaimal Singh & District Pathankot, Punjab.
StatusCleared for impact study
Status since4 Jun 2026
Application filed28 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantGuru Mehr Constructions
Land area2.1 acres (0.9 ha)
Project cost₹25 lakh
Village / localityChak Gajju
Taluk / tehsilPathankot
DistrictPathankot
StatePunjab
Location fromSite area on record
Our referenceWID-PB-01240

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 Nov 2026Under environmental review2.1 acres₹25 lakh
Early planning filed 28 May 2026 (this page)Cleared for impact study2.1 acres₹25 lakh

In context

109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 2.1 acres, this one is smaller than 94% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 191.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.

Where it is

Chak Gajju, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.