Quick answers
What is this project?
Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining lease area of 0.85 hectares (Total Cluster Area- 49.34 Ha, falling in Khasra Nos. 12//10/2, 9/2, 10/1, 2/2 is a proposed mining project in Chak Gajju, Pathankot, Punjab. The site covers 2.1 acres.
Who is building it?
The applicant is Guru Mehr Constructions.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Chak Gajju, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹25 lakh and a site of 2.1 acres.
When was it filed?
The application was filed on 13 Nov 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining lease area of…
Project details
| Official title | Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining lease area of 0.85 hectares (Total Cluster Area- 49.34 Ha, falling in Khasra Nos. 12//10/2, 9/2, 10/1, 2/2 in Village- Chak Gajju, (CRMS-25), Hadbast No. 58, Village Chak Gajju, Tehsil- Narot Jaimal Singh, District- Pathankot, State- Punjab by Shri Darshan Singh, Partner M/s Guru Mehr Constructions, Village Akhwara, Tehsil Narot Jaimal Singh & District Pathankot, Punjab. |
|---|---|
| Status | Under environmental review |
| Status since | 19 Nov 2026 |
| Application filed | 13 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Guru Mehr Constructions |
| Land area | 2.1 acres (0.9 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Chak Gajju |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site area on record |
| Our reference | WID-PB-03758 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Nov 2026 (this page) | Under environmental review | 2.1 acres | ₹25 lakh |
| Early planning filed 28 May 2026 | Cleared for impact study | 2.1 acres | ₹25 lakh |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 2.1 acres, this one is smaller than 94% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 191.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Chak Gajju, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining… — cleared for impact study, 0 m away
- Minor Mineral (RBM) Mining Project(CRMS 144) located near Village- Chak Gajju,… — under environmental review, 450 m away
- Amendment in Environmental Clearance Granted by Seiaa, Punjab Vide File No.… — lapsed, 450 m away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) Over an Area of 36.84 Ha… — lapsed, 450 m away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — environmental approval granted, 550 m away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — lapsed, 550 m away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — environmental approval granted, 550 m away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — cleared for impact study, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.