Quick answers
What is this project?
Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No. Seiaa/Ms/2022/1318 With Production Capacity of 592244 Tpa Over an Area of 36.84 Ha on the Ravi River Bed is an approved mining project in Bhatian, Pathankot, Punjab. The site covers 91 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Mar 2024), as of 27 Nov 2026.
Where is it?
In Bhatian, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹23 crore and a site of 91 acres.
When was it filed?
The application was filed on 28 Feb 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No. Seiaa/Ms/2022/1318…
Project details
| Official title | Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No. Seiaa/Ms/2022/1318 With Production Capacity of 592244 Tpa Over an Area of 36.84 Ha on the Ravi River Bed Located at Village- Shahpurgopi and Gol Tehsil & District- Pathankot, State Punjab Through Xen/Dmo District Pathankot, Government of Punjab |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 Mar 2024 |
| Application filed | 28 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Department of Irrigation |
| Land area | 91 acres (36.8 ha) |
| Project cost | ₹23 crore |
| Village / locality | Bhatian |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site area on record |
| Our reference | WID-PB-00678 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 18 Mar 2024 | Environmental approval granted | 91 acres | ₹23 crore |
| New project filed 28 Feb 2024 (this page) | Environmental approval granted | 91 acres | ₹23 crore |
| Early planning filed 7 Oct 2023 | Cleared for impact study | 91 acres | ₹23 crore |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 91 acres, this one is larger than 93% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 280.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Bhatian, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — environmental approval granted, 0 m away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — lapsed, 0 m away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — cleared for impact study, 0 m away
- Amendment in Environmental Clearance Granted by Seiaa, Punjab Vide File No.… — lapsed, 200 m away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) Over an Area of 36.84 Ha… — lapsed, 200 m away
- Minor Mineral (RBM) Mining Project(CRMS 144) located near Village- Chak Gajju,… — under environmental review, 400 m away
- Minor Mineral (RBM) Mining Project( CRMS 82) for obtaining terms of reference,… — under environmental review, 500 m away
- Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining… — under environmental review, 550 m away
More from Department of Irrigation in Pathankot
- Amendment in Environmental Clearance Granted by Seiaa, Punjab Vide File No.… — lapsed
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — withdrawn
- Mining of minor mineral i.e.RBM from the bed of river Ravi — withdrawn
- Proposed RBM mining project having an area 4.14 Ha — lapsed
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — lapsed
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — cleared for impact study
15 Department of Irrigation, Punjab projects in Pathankot
All 157 Department of Irrigation, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.