Quick answers
What is this project?
Diversion of forest land for Proposed for CCD Signature Green City abutting on boundary of SH-40 at KM 25.680 (LHS) Fazilka – Malout Road, Vill Arniwala, Distt Fazilka, Punjab is a lapsed road project in Arniwala, Fazilka, Punjab. The site covers 15.3 acres.
Who is building it?
The applicant is Ccd Signature Green City.
Has it been approved?
No. The application was lapsed on 12 Sept 2026, so it is no longer under consideration.
Where is it?
In Arniwala, Fazilka, Punjab.
How big is it?
It has a stated cost of ₹7 crore; a site of 15.3 acres and 1,110 m² of forest land.
When was it filed?
The application was filed on 23 Jan 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 Sept 2026 |
| Application filed | 23 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ccd Signature Green City |
| Land area | 15.3 acres (6.2 ha) |
| Forest land | 1,110 m² |
| Project cost | ₹7 crore |
| Village / locality | Arniwala |
| Taluk / tehsil | Fazilka |
| District | Fazilka |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01632 |
In context
21 applications in Fazilka since January 2022 are in the same category (Roads & highways): 4 approved, 4 filed or under review, and 12 withdrawn, lapsed or rejected. At 15.3 acres, this one is larger than 75% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arniwala, Fazilka, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road project by Gulshan Developers and Builders — more information requested, 200 m away
- Diversion of 0.0309 ha. Forest land for access to retail outlet of M/s IOCL — forest land use approved, 300 m away
- Laying of Sewerage Pipe Line along the SH-40, from CH 26+881 to 29+110(RHS)… — lapsed, 2.2 km away
- Proposed underground water pipe line on Malout-Fazilka Road KM 29 to 30 B/s — forest land use approved, 4 km away
- Forest land for access to retail outlet of M/S IOCL — forest land use approved, 5.1 km away
- Forest Land for Access to Retail Outlet of M/S Iocl by IOCL — forest land use approved, 5.1 km away
- Diversion of 1.8023 ha. Forest Land for Laying OFC along the route from (1)… — forest land use approved, 6.6 km away
- Large Surface Water Project Ghattian Wali Bodla For providing bulk supply of… — forest land use approved, 8.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.