Quick answers
What is Road project by Gulshan Developers and Builders?
This proposed road project by Gulshan Developers and Builders is in Arniwala Sheikh Subhan (199), Fazilka, Punjab. The site covers 2.8 acres.
Who is building it?
The applicant is Gulshan Developers and Builders.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Arniwala Sheikh Subhan (199), Fazilka, Punjab.
How big is it?
It has a stated cost of ₹2.2 crore; a site of 2.8 acres and 1,330 m² of forest land.
When was it filed?
The application was filed on 1 Sept 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 1 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Gulshan Developers and Builders |
| Land area | 2.8 acres (1.1 ha) |
| Forest land | 1,330 m² |
| Project cost | ₹2.2 crore |
| Village / locality | Arniwala Sheikh Subhan (199) |
| Taluk / tehsil | Fazilka |
| District | Fazilka |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03493 |
In context
21 applications in Fazilka since January 2022 are in the same category (Roads & highways): 4 approved, 4 filed or under review, and 12 withdrawn, lapsed or rejected. At 2.8 acres, this one is smaller than 65% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arniwala Sheikh Subhan (199), Fazilka, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0309 ha. Forest land for access to retail outlet of M/s IOCL — forest land use approved, 150 m away
- Diversion of forest land for Proposed for CCD Signature Green City abutting on… — lapsed, 200 m away
- Laying of Sewerage Pipe Line along the SH-40, from CH 26+881 to 29+110(RHS)… — lapsed, 2.3 km away
- Proposed underground water pipe line on Malout-Fazilka Road KM 29 to 30 B/s — forest land use approved, 4.1 km away
- Forest land for access to retail outlet of M/S IOCL — forest land use approved, 5.2 km away
- Forest Land for Access to Retail Outlet of M/S Iocl by IOCL — forest land use approved, 5.3 km away
- Diversion of 1.8023 ha. Forest Land for Laying OFC along the route from (1)… — forest land use approved, 6.5 km away
- Large Surface Water Project Ghattian Wali Bodla For providing bulk supply of… — forest land use approved, 8.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.