Quick answers
What is Permission for Laying 1000 MM dia water Supply pipeline?
Permission for Laying 1000 MM dia water Supply pipeline is a lapsed pipeline project in Kheri Gandian, Rajpura, Patiala, Punjab. The site covers 0.3 acres.
Who is building it?
The applicant is Punjab Water Supply and Sewerage Divsion No.1 Patiala..
Has it been approved?
No. The application was lapsed on 13 Nov 2026, so it is no longer under consideration.
Where is it?
In Kheri Gandian, Rajpura, Patiala, Punjab.
How big is it?
It has a stated cost of ₹5 crore; a site of 0.3 acres and 1,200 m² of forest land.
When was it filed?
The application was filed on 19 Aug 2026.
Project details
| Official title | Permission for Laying 1000 MM dia water Supply pipeline along with Zirakpur-Patiala Road B/w Km 35-36 L/S Tehsil: Rajpura Distt: Patiala. . |
|---|---|
| Status | Lapsed |
| Status since | 13 Nov 2026 |
| Application filed | 19 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Punjab Water Supply and Sewerage Divsion No.1 Patiala. |
| Land area | 1,200 m² |
| Forest land | 1,200 m² |
| Project cost | ₹5 crore |
| Village / locality | Kheri Gandian |
| Taluk / tehsil | Rajpura |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02612 |
In context
12 applications in Patiala since January 2022 are in the same category (Pipelines): 4 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 64% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kheri Gandian, Rajpura, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential & Commercial Project of "M/S Bagga Brothers" — more information requested, 1.6 km away
- Hotel Building for Ashok Kumar — lapsed, 2 km away
- Expansion of the Existing Chloro Alkali Plant for Increase in the Production… — environmental approval granted, 3 km away
- Expansion of the Existing Chloro Alkali Plant for Increase in the Production… — cleared for impact study, 3 km away
- Expansion of the Existing Chloro Alkali Plant for Increase in the Production… — environmental approval granted, 3 km away
- Proposed Industrial Unit for Manufacturing of Plasticizers and Chlorinated… — withdrawn, 3.1 km away
- Proposed Industrial Unit for Manufacturing of Plasticizers and Chlorinated… — cleared for impact study, 3.1 km away
- Proposed Industrial Unit for Manufacturing of Chlorinated Methyl Fatty Ester… — environmental approval granted, 3.2 km away
More from Punjab Water Supply and Sewerage Divsion No.1 Patiala. in Patiala
- Permission for Laying 24x7 Drinking Water Supply in Patiala City along Bhakhra… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.