Quick answers
What is this project?
Proposed Sand Mining (boulder, gravel, sand) project (site no (PO_LD_LD2_ST_24A in DSR) as per approved DSR No. SEIAA/MS/2023/87 with production capacity of 61912 TPA over an area of 6.60 ha on the Sutlej riverbed is a proposed mining project in Garhi Fazal, Ludhiana (East), Ludhiana, Punjab. The site covers 16.3 acres.
Who is building it?
The applicant is Executive Engineer Cum District Mining Officer Ludhiana.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Aug 2023), as of 27 Nov 2026.
Where is it?
In Garhi Fazal, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹3 lakh and a site of 16.3 acres.
When was it filed?
The application was filed on 26 Aug 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining (boulder, gravel, sand) project (site no (PO_LD_LD2_ST_24A in DSR)…
Project details
| Official title | Proposed Sand Mining (boulder, gravel, sand) project (site no (PO_LD_LD2_ST_24A in DSR) as per approved DSR No. SEIAA/MS/2023/87 with production capacity of 61912 TPA over an area of 6.60 ha on the Sutlej riverbed located at Village- Garhi Fazil And Sekhewal, Tehsil- Ludhiana-East, District- Ludhiana, State Punjab through Executive Engineer/ Ludhiana, Drainage cum Mines and Geology WRD Punjab |
|---|---|
| Status | Cleared for impact study |
| Status since | 26 Aug 2023 |
| Application filed | 26 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Executive Engineer Cum District Mining Officer Ludhiana |
| Land area | 16.3 acres (6.6 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Garhi Fazal |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00051 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 May 2024 | Environmental approval granted | 16.3 acres | ₹3 lakh |
| Early planning filed 26 Aug 2023 (this page) | Cleared for impact study | 16.3 acres | ₹3 lakh |
In context
65 applications in Ludhiana since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 16.3 acres, this one is smaller than 65% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 26.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Garhi Fazal, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — environmental approval granted, 0 m away
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_72) — cleared for impact study, 250 m away
- Proposed Sand mining project, Village- Talwandi sibhu , District- SBS Nagar… — more information requested, 4.1 km away
- Proposed Sand mining project, Village- Talwandi sibhu , District- SBS Nagar… — cleared for impact study, 4.1 km away
- Desilting of River Sutlej at Mand Chaunta Complex in Between RD… — not approved, 4.7 km away
- Minor Mineral (Sand) Mining Project, located near Village – Hadiwal, Tehsil &… — environmental approval granted, 5.7 km away
- Amendment in Environmental Clearance (EC) granted to Integrated Industrial… — environmental approval granted, 6.6 km away
- Proposed Sand Mining (boulder, gravel, sand) project (site no PO_SN_AR_ST_61… — environmental approval granted, 7 km away
More from Executive Engineer Cum District Mining Officer Ludhiana in Ludhiana
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — environmental approval granted
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed
- Desilting of River Sutlej in between RD 1000-11760 of 4-L Bandh of River… — lapsed
- Desilting of River Sutlej by Abadies and Agricultural Land — not approved
- Desilting of River Sutlej in between RD 38730-40980 of 4-L Bandh of River… — lapsed
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed
40 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects in Ludhiana
All 43 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.