One of 5 filings for this project. The project's main page, with every filing and where each stands: Desilting of Beas River
Project details
| Official title | Desilting of Beas River in Village Naushera Pattan,Tehsil Mukerian , Distt Hoshiarpur.(Punjab) |
|---|---|
| Status | More information requested |
| Status since | 13 Jan 2026 |
| Application filed | 13 Jan 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Drainage Cum District Mining Officer Hoshiarpur |
| Land area | 13 acres (5.3 ha) |
| Project cost | ₹3.1 crore |
| Village / locality | Naushera |
| Taluk / tehsil | Mukerian |
| District | Hoshiarpur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03655 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Mar 2026 | More information requested | 13 acres | ₹3.1 crore |
| New project filed 27 Mar 2026 | More information requested | 13 acres | ₹3.1 crore |
| New project filed 20 Jan 2026 | More information requested | 13 acres | ₹3.1 crore |
| New project filed 15 Jan 2026 | More information requested | 13 acres | ₹3.1 crore |
| New project filed 13 Jan 2026 (this page) | More information requested | 13 acres | ₹3.1 crore |
In context
35 applications in Hoshiarpur since January 2022 are in the same category (Buildings & townships): 6 approved, 20 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 13 acres, this one is smaller than 57% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naushera, Mukerian, Hoshiarpur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Desilting of Beas River — more information requested, 0 m away
- Desilting of Beas River — more information requested, 0 m away
- Desilting of Beas River — more information requested, 0 m away
- Desilting of Beas River — more information requested, 0 m away
- Approach Access Road for Dashmesh Super Speciality Hospital for M/s Sri Guru… — forest land use approved, 3.3 km away
- Proposed Restaurant Apne Chai Wala — lapsed, 3.3 km away
- Drain in front of retail outlet of Reliance BP Mobility Ltd — forest land use approved, 5.5 km away
- Approach road to retail outlet of Reliance BP Mobility Ltd — forest land use approved, 5.5 km away
More from Executive Engineer Drainage Cum District Mining Officer Hoshiarpur in Hoshiarpur
- Desilting of Restoring water capacity by clearing Syphon Aqueduct at RD ± 200… — lapsed
- Desilting of Beas River — under wildlife review
- Desilting of Beas River — under wildlife review
- Desilting of Beas River — more information requested
- Desilting of Beas River — more information requested
- Desilting of Chabbewal Choe Near Village Chak Sadhu And Chak Harnoli In Distt… — lapsed
22 Executive Engineer Drainage Cum District Mining Officer Hoshiarpur, Punjab projects in Hoshiarpur
All 24 Executive Engineer Drainage Cum District Mining Officer Hoshiarpur, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.