What is this project?
Agribiotech Industries Limited: Expansion of Grain-Based Distillery From 74 Klpd to 120 Klpd in Rs/Ena&ta, 11,000 Cases Per Day to 15,000 Cases Per Day, Co2 Generation Plant From 18 Mt/Day to 50 Mt/Day and Co-Generation From 1.2 MW to 3.0 MW, Dwgs 125 Mt/Day to Ddgs - 60 Mt/Day and Fusel Oil From 200 Litres to 400 Litres by Modernization is an approved industrial project in Ajitgarh, Sri Madhopur, Sikar, Rajasthan. The site covers 33 acres.
Who is building it?
The applicant is Agribiotech Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Nov 2023), as of 27 Nov 2026.
Where is it?
In Ajitgarh, Sri Madhopur, Sikar, Rajasthan.
How big is it?
It has a stated cost of ₹111.9 crore and a site of 33 acres.
When was it filed?
The application was filed on 16 Nov 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Agribiotech Industries Limited |
| Land area | 33 acres (13.4 ha) |
| Project cost | ₹111.9 crore |
| Village / locality | Ajitgarh |
| Taluk / tehsil | Sri Madhopur |
| District | Sikar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00392 |
In context
5 applications in Sikar since January 2022 are in the same category (Industry): 3 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Ajitgarh, Sri Madhopur, Sikar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- : Proposed Forest Land Diversion of Existing Lease & Approach Road M.L.-… — more information requested, 5.4 km away
- Greenfield Steel Plant Project to produce Pellets 1.0 Million TPA; DRI 0.4… — withdrawn, 6 km away
- Greenfield Steel Plant Project to produce Pellets 1.0 Million TPA; DRI 0.4… — withdrawn, 6 km away
- Greenfield Steel Plant Project to produce Pellets 1.0 Million TPA; DRI 0.4… — cleared for impact study, 6 km away
- Re-appraisal of EC granted by DEIAA to SEIAA in compliance of MoEF & CC O.M.… — environmental approval granted, 9.3 km away
- Proposed Enhancement in Existing Production Capacity from 101090 TPA to 649272… — lapsed, 9.5 km away
- Proposed Enhancement in Existing Production Capacity from 1,01,090 TPA (ROM)… — cleared for impact study, 9.5 km away
- Proposed Enhancement in Existing Production Capacity from 101090 TPA (ROM) to… — not approved, 9.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.