Quick answers
What is this project?
Greenfield Steel Plant Project to produce Pellets 1.0 Million TPA; DRI 0.4 Million TPA, MS Billets 0.42 Million TPA and 0.4 Million TPA TMT Rebars with Iron ore beneficiation plant of capacity 2.65 Million TPA & Captive Power generation of 28 MW through WHRB and 15 MW through AFBC is a withdrawn industrial project in Garhtaknet, Sri Madhopur, Sikar, Rajasthan. The site covers 506 acres.
Who is building it?
The applicant is Geetanjali Steel Private Limited.
Has it been approved?
No. The application was withdrawn on 4 Sept 2023, so it is no longer under consideration.
Where is it?
In Garhtaknet, Sri Madhopur, Sikar, Rajasthan.
How big is it?
It has a stated cost of ₹1,772.1 crore and a site of 506 acres.
When was it filed?
The application was filed on 31 Aug 2023.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 4 Sept 2023 |
| Application filed | 31 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Geetanjali Steel Private Limited |
| Land area | 506 acres (204.8 ha) |
| Project cost | ₹1,772.1 crore |
| Village / locality | Garhtaknet |
| Taluk / tehsil | Sri Madhopur |
| District | Sikar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-02210 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 26 Apr 2024 | Cleared for impact study | 506 acres | ₹1,791.7 crore |
| Early planning filed 6 Mar 2024 | Withdrawn | 506 acres | ₹1,770 crore |
| Early planning filed 31 Aug 2023 (this page) | Withdrawn | 506 acres | ₹1,772.1 crore |
In context
5 applications in Sikar since January 2022 are in the same category (Industry): 3 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Garhtaknet, Sri Madhopur, Sikar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Steel Plant Project to produce Pellets 1.0 Million TPA; DRI 0.4… — cleared for impact study, 50 m away
- Greenfield Steel Plant Project to produce Pellets 1.0 Million TPA; DRI 0.4… — withdrawn, 50 m away
- Agribiotech Industries Limited: Expansion of Grain-Based Distillery From 74… — environmental approval granted, 6 km away
- : Proposed Forest Land Diversion of Existing Lease & Approach Road M.L.-… — more information requested, 6.4 km away
- Re-appraisal of EC granted by DEIAA to SEIAA in compliance of MoEF & CC O.M.… — environmental approval granted, 8.2 km away
- Reappraisal of Earlier Granted EC By DEIAA, Sikar (Raj.) Vide Letter No.… — environmental approval granted, 8.4 km away
- Proposed Enhancement in Existing Production Capacity from 101090 TPA to 649272… — lapsed, 8.4 km away
- Proposed Enhancement in Existing Production Capacity from 1,01,090 TPA (ROM)… — cleared for impact study, 8.4 km away
All 3 Geetanjali Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.