Quick answers
What is Brahmani Pumped Storage Project (600 MW)?
Brahmani Pumped Storage Project (600 MW) is a proposed water and irrigation project in Bamanhera, Begun, Chittaurgarh, Rajasthan. The site covers 3,422.7 acres.
Who is building it?
The applicant is Acme Cleantech Solutions Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Dec 2023), as of 27 Nov 2026.
Where is it?
In Bamanhera, Begun, Chittaurgarh, Rajasthan.
How big is it?
It has a stated cost of ₹2,730.5 crore and a site of 3,422.7 acres.
When was it filed?
The application was filed on 21 Sept 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Dec 2023 |
| Application filed | 21 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Acme Cleantech Solutions Private Limited |
| Land area | 3,422.7 acres (1,385.1 ha) |
| Project cost | ₹2,730.5 crore |
| Village / locality | Bamanhera |
| Taluk / tehsil | Begun |
| District | Chittaurgarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00757 |
In context
7 applications in Chittaurgarh since January 2022 are in the same category (Water & irrigation): 5 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bamanhera, Begun, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ql 05 Mukesh Dad Rawarda-B Ext. Chittorgarh — lapsed, 2.4 km away
- Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0… — lapsed, 2.4 km away
- Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0… — cleared for impact study, 2.4 km away
- Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0… — returned to applicant, 2.4 km away
- Madhu Garg Q.L 17 Rawarda B Ext. Chittorgarh — lapsed, 2.5 km away
- Priya Dinkar QL 42 Rawarda C — lapsed, 2.9 km away
- Rakhi Dinkar QL 16 Umar Ext. — lapsed, 2.9 km away
- Shyam Bihari Dinkar QL 38 Rawarda C — lapsed, 3 km away
All 7 Acme Cleantech Solutions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.