Quick answers
What is this project?
Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0 Mtpa Over Mine Lease Area of 741 Ha by M/S Jk Cement Limited is a proposed mining project in Thuk Rai, Begun, Chittaurgarh, Rajasthan. The site covers 1,831 acres.
Who is building it?
The applicant is J K Cement Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Thuk Rai, Begun, Chittaurgarh, Rajasthan.
How big is it?
It has a stated cost of ₹35.4 crore and a site of 1,831 acres.
When was it filed?
The application was filed on 19 Aug 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0 Mtpa Over…
Project details
| Official title | Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0 Mtpa Over Mine Lease Area of 741 Ha Along With Installation of Crusher With Capacity of 1500 Tph Located Near Village Chandakheri, Tehsil- Begun, District- Chittorgarh, State-Rajasthan by M/S Jk Cement Limited |
|---|---|
| Status | Returned to applicant |
| Status since | 10 Sept 2025 |
| Application filed | 19 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | J K Cement Limited |
| Land area | 1,831 acres (741 ha) |
| Project cost | ₹35.4 crore |
| Village / locality | Thuk Rai |
| Taluk / tehsil | Begun |
| District | Chittaurgarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-22356 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 21 Oct 2025 | Cleared for impact study | 1,831 acres | ₹35.4 crore |
| Early planning filed 19 Aug 2025 (this page) | Returned to applicant | 1,831 acres | ₹35.4 crore |
In context
2,142 applications in Chittaurgarh since January 2022 are in the same category (Mining): 1,206 approved, 59 filed or under review, and 877 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1,831 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Thuk Rai, Begun, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0… — lapsed, 0 m away
- Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0… — cleared for impact study, 0 m away
- Brahmani Pumped Storage Project (600 MW) — cleared for impact study, 2.4 km away
- Ramesh Singh Q.L 06 Umar Chittorgarh — lapsed, 4.6 km away
- Chandra kant Vyas Q.L 12 UMAR CHITTORGARH — lapsed, 4.6 km away
- Rakhi Dinkar QL 16 Umar Ext. — lapsed, 4.6 km away
- Sanjay Kumar Sharma Q.L 22 Umar Chittorgarh — lapsed, 4.6 km away
- Ql 05 Mukesh Dad Rawarda-B Ext. Chittorgarh — lapsed, 4.6 km away
More from J K Cement Limited in Chittaurgarh
- Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0… — lapsed
- "Sindwari Charlia Auctioned Block-A'' with proposed maximum excavation 1.083… — environmental approval granted
- Proposed expansion under para 7(ii) of EIA notification 2006, in production… — environmental approval granted
- "Sindwari Charlia Auctioned Block-A'' with proposed maximum excavation 1.083… — cleared for impact study
- Proposed reassessment of EC letter granted by DEIAA, Chittorgarh vide letter… — environmental approval granted
- Proposed expansion under para 7(ii) of EIA notification 2006, in production… — environmental approval granted
10 J K Cement projects in Chittaurgarh
All 67 J K Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.