LapsedMining · Chittaurgarh, Rajasthan

Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0 Mtpa Over Mine Lease Area of 741 Ha by M/S Jk Cement Limited

Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0 Mtpa Over Mine Lease Area of 741 Ha by M/S Jk Cement Limited is a lapsed mining project in Parkhiya Kheri, Begun, Chittaurgarh, Rajasthan. The site covers 1,831 acres. Its stated project cost is ₹35.4 crore. As of 27 Nov 2026, its status is “Lapsed” (since 19 Sept 2026).

See it on the live map All projects in Chittaurgarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Chandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0 Mtpa Over Mine Lease Area of 741 Ha by M/S Jk Cement Limited is a lapsed mining project in Parkhiya Kheri, Begun, Chittaurgarh, Rajasthan. The site covers 1,831 acres.

Who is building it?

The applicant is J K Cement Limited.

Has it been approved?

No. The application was lapsed on 19 Sept 2026, so it is no longer under consideration.

Where is it?

In Parkhiya Kheri, Begun, Chittaurgarh, Rajasthan.

How big is it?

It has a stated cost of ₹35.4 crore and a site of 1,831 acres.

When was it filed?

The application was filed on 17 Aug 2026.

Project details

Official titleChandakheri Limestone Block With Proposed Limestone Production Capacity of 4.0 Mtpa Over Mine Lease Area of 741 Ha Along With Installation of Crusher With Capacity of 1500 Tph Located Near Village Chandakheri, Tehsil- Begun, District- Chittorgarh, State-Rajasthan by M/S Jk Cement Limited
StatusLapsed
Status since19 Sept 2026
Application filed17 Aug 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantJ K Cement Limited
Land area1,831 acres (741 ha)
Project cost₹35.4 crore
Village / localityParkhiya Kheri
Taluk / tehsilBegun
DistrictChittaurgarh
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-32087

In context

2,142 applications in Chittaurgarh since January 2022 are in the same category (Mining): 1,206 approved, 59 filed or under review, and 877 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1,831 acres, this one is larger than 99% of them.

No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.

Where it is

Parkhiya Kheri, Begun, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from J K Cement Limited in Chittaurgarh

10 J K Cement projects in Chittaurgarh
All 67 J K Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.