Environmental approval grantedIndustry · Pali, Rajasthan

Proposed Expansion of Integrated Cement Plant-Clinker (2.4 million TPA to 3.5 million TPA), Cement ( Existing 3.6 million TPA-No change), WHRB (7.5 MW to 12 MW) and CPP ( Existing 18 & 15 MW-No change), by Installation of new Line-II (Rotary Kiln 2800 TPD) and new Fly Ash Dryer 1000 TPD

Proposed Expansion of Integrated Cement Plant-Clinker (2.4 million TPA to 3.5 million TPA), Cement ( Existing 3.6 million TPA-No change), WHRB (7.5 MW to 12 MW) and CPP ( Existing 18 & 15 MW-No change), by Installation of new Line-II (Rotary Kiln 2800 TPD) and new Fly Ash Dryer 1000 TPD is an approved industrial project in Rabariyawas, Jaitaran, Pali, Rajasthan. The site covers 1,163.2 acres. Its stated project cost is ₹2,290.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 1 Nov 2024).

See it on the live map All projects in Pali

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Integrated Cement Plant-Clinker (2.4 million TPA to 3.5 million TPA), Cement ( Existing 3.6 million TPA-No change), WHRB (7.5 MW to 12 MW) and CPP ( Existing 18 & 15 MW-No change), by Installation of new Line-II (Rotary Kiln 2800 TPD) and new Fly Ash Dryer 1000 TPD is an approved industrial project in Rabariyawas, Jaitaran, Pali, Rajasthan. The site covers 1,163.2 acres.

Who is building it?

The applicant is Ambuja Cement Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 1 Nov 2024), as of 27 Nov 2026.

Where is it?

In Rabariyawas, Jaitaran, Pali, Rajasthan.

How big is it?

It has a stated cost of ₹2,290.5 crore and a site of 1,163.2 acres.

When was it filed?

The application was filed on 21 Aug 2024.

Project details

Official titleProposed Expansion of Integrated Cement Plant-Clinker (2.4 million TPA to 3.5 million TPA), Cement ( Existing 3.6 million TPA-No change), WHRB (7.5 MW to 12 MW) and CPP ( Existing 18 & 15 MW-No change), by Installation of new Line-II (Rotary Kiln 2800 TPD) and new Fly Ash Dryer 1000 TPD at Village Rabriyawas, Tehsil Jaitaran, District Pali, Rajasthan.
StatusEnvironmental approval granted
Status since1 Nov 2024
Application filed21 Aug 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantAmbuja Cement Limited
Land area1,163.2 acres (470.7 ha)
Project cost₹2,290.5 crore
Village / localityRabariyawas
Taluk / tehsilJaitaran
DistrictPali
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-01549

In context

13 applications in Pali since January 2022 are in the same category (Industry): 10 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,163.2 acres, this one is larger than 85% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rabariyawas, Jaitaran, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.