LapsedMining · Pali, Rajasthan

Expansion in granted Production Capacity 3.3 to 5.77 MTPA ROM (Limestone: 5.25 MTPA & Mineral Reject: 0.52 MTPA), Top Soil: 0.001 MTPA, OB: 3.08 MTPA, (Total Excavation: 8.851 MTPA) & Proposed Crusher 1500TPH Capacity

Expansion in granted Production Capacity 3.3 to 5.77 MTPA ROM (Limestone: 5.25 MTPA & Mineral Reject: 0.52 MTPA), Top Soil: 0.001 MTPA, OB: 3.08 MTPA, (Total Excavation: 8.851 MTPA) & Proposed Crusher 1500TPH Capacity is a lapsed mining project in Dagla, Jaitaran, Pali, Rajasthan. The site covers 1,704.4 acres. Its stated project cost is ₹306.9 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Pali

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion in granted Production Capacity 3.3 to 5.77 MTPA ROM (Limestone: 5.25 MTPA & Mineral Reject: 0.52 MTPA), Top Soil: 0.001 MTPA, OB: 3.08 MTPA, (Total Excavation: 8.851 MTPA) & Proposed Crusher 1500TPH Capacity is a lapsed mining project in Dagla, Jaitaran, Pali, Rajasthan. The site covers 1,704.4 acres.

Who is building it?

The applicant is UltraTech Cement Limited.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Dagla, Jaitaran, Pali, Rajasthan.

How big is it?

It has a stated cost of ₹306.9 crore and a site of 1,704.4 acres.

When was it filed?

The application was filed on 23 Jun 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in granted Production Capacity 3.3 to 5.77 MTPA ROM (Limestone: 5.25 MTPA &…

Project details

Official titleExpansion in granted Production Capacity 3.3 to 5.77 MTPA ROM (Limestone: 5.25 MTPA & Mineral Reject: 0.52 MTPA), Top Soil: 0.001 MTPA, OB: 3.08 MTPA, (Total Excavation: 8.851 MTPA) & Proposed Crusher 1500TPH Capacity along with Wobbler (ML No. 29/99, ML Area: 689.76 ha) located at Villages: Moharai, Dagla, Asarlai, Tunkara, Nimbera Khurd in Tehsil: Jaitaran and Village: Meshia in Tehsil: Raipur, District: Pali, Rajasthan
StatusLapsed
Status since29 Oct 2024
Application filed23 Jun 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantUltraTech Cement Limited
Land area1,704.4 acres (689.8 ha)
Project cost₹306.9 crore
Village / localityDagla
Taluk / tehsilJaitaran
DistrictPali
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-01894

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 27 Jun 2023Environmental approval granted1,704.4 acres₹306.9 crore
Early planning filed 23 Jun 2023 (this page)Lapsed1,704.4 acres₹306.9 crore

In context

1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1,704.4 acres, this one is larger than 99% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Dagla, Jaitaran, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from UltraTech Cement Limited in Pali

4 UltraTech Cement projects in Pali
All 182 UltraTech Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.