Expansion in ROM Production Capacity 5.77 to 12.90 MTPA (Limestone: 5.25 to 10.965 Million TPA & Mineral (Screen) Reject: 0.52 to 1.935 Million TPA), Top Soil: 0.005 Million TPA, OB: 9.47 Million TPA (Total Excavation: 22.375 Million TPA) (ML No. 29/99, ML Area: 689.76 ha) located at Villages: Nimbera Khurd, Tunkara, Dagla, Moharai, Asarlai is a lapsed mining project in Maheshiya, Raipur, Pali, Rajasthan. The site covers 1,704.4 acres.
Who is building it?
The applicant is UltraTech Cement Limited.
Has it been approved?
No. The application was lapsed on 2 Mar 2026, so it is no longer under consideration.
Where is it?
In Maheshiya, Raipur, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹372 crore and a site of 1,704.4 acres.
When was it filed?
The application was filed on 2 Mar 2026.
Project details
| Official title | Expansion in ROM Production Capacity 5.77 to 12.90 MTPA (Limestone: 5.25 to 10.965 Million TPA & Mineral (Screen) Reject: 0.52 to 1.935 Million TPA), Top Soil: 0.005 Million TPA, OB: 9.47 Million TPA (Total Excavation: 22.375 Million TPA) (ML No. 29/99, ML Area: 689.76 ha) located at Villages: Nimbera Khurd, Tunkara, Dagla, Moharai, Asarlai in Tehsil: Jaitaran and Village: Meshia in Tehsil: Raipur, District: Beawar, Rajasthan. |
|---|---|
| Status | Lapsed |
| Status since | 2 Mar 2026 |
| Application filed | 2 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | UltraTech Cement Limited |
| Land area | 1,704.4 acres (689.8 ha) |
| Project cost | ₹372 crore |
| Village / locality | Maheshiya |
| Taluk / tehsil | Raipur |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33982 |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1,704.4 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Maheshiya, Raipur, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in granted Production Capacity 3.3 to 5.77 MTPA ROM (Limestone: 5.25… — environmental approval granted, 0 m away
- Expansion in granted Production Capacity 3.3 to 5.77 MTPA ROM (Limestone: 5.25… — lapsed, 0 m away
- Mesiya River Sand Mining Project (Plot No. 01, Lease area-100 ha.) At Khasra… — lapsed, 3.8 km away
- Proposed River Sand (Bajri) Mining Project (Plot No. 01, Lease area-100 ha.)… — returned to applicant, 4 km away
- Proposed River Sand (Bajri) Mining Project (Plot No. 01, Lease area-100 ha.)… — environmental approval granted, 4 km away
- Mesiya River Sand Mining Project (Plot No. 01, Lease area-100 ha.) At Khasra… — cleared for impact study, 4 km away
- Amendment in Environmental Clearance granted for Integrated Cement Plant at… — environmental approval granted, 5.1 km away
- Bajri Mining Project, Plot No. 08/2025 having mine lease area 37.5514 hectare… — cleared for impact study, 7.9 km away
More from UltraTech Cement Limited in Pali
- Amendment in Environmental Clearance granted for Integrated Cement Plant at… — environmental approval granted
- Expansion in granted Production Capacity 3.3 to 5.77 MTPA ROM (Limestone: 5.25… — environmental approval granted
- Expansion in granted Production Capacity 3.3 to 5.77 MTPA ROM (Limestone: 5.25… — lapsed
4 UltraTech Cement projects in Pali
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.