Quick answers
What is this project?
Shri Neeraj Yadav, Re-appraisal of Environment Clearance, Masonary Stone mining project, M.L.-1/1996 is an approved mining project in Barlan, Atru, Baran, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Neeraj Yadav.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Dec 2024), as of 27 Nov 2026.
Where is it?
In Barlan, Atru, Baran, Rajasthan.
How big is it?
It has a stated cost of ₹20 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 24 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Dec 2024 |
| Application filed | 24 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Neeraj Yadav |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Barlan |
| Taluk / tehsil | Atru |
| District | Baran |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-09142 |
In context
82 applications in Baran since January 2022 are in the same category (Mining): 47 approved, 14 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 100% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Barlan, Atru, Baran, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Conveyor Belt for Proposed Expansion of Kawai Thermal Power Plant under… — lapsed, 4.4 km away
- Construction of road Dada to Kanchanpura — forest land use approved, 4.9 km away
- Masonry Stone Mining Project, M.L.-05/2024 (Ref. No. 202410000112560),… — environmental approval granted, 5.8 km away
- Proposed Masonry Stone Mining Project, M.L.-05/2024, Applied (L.O.I)… — under environmental review, 5.8 km away
- Proposed Expansion of Kawai Thermal Power Plant under Phase–II by adding 3200… — environmental approval granted, 6 km away
- Proposed Expansion of Kawai Thermal Power Plant under Phase–II by adding 3200… — cleared for impact study, 6 km away
- Simlod to Shahpura Via Shripura — not approved, 8.9 km away
- Shri Dhanraj Meena , Masonary Stone Mining Project , Reference No.… — environmental approval granted, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.