What is Developing? Open the mapMap

Under environmental reviewMining · Baran, Rajasthan

Proposed Masonry Stone Mining Project, M.L.-05/2024, Applied (L.O.I) Area-1.1386 Hectare, Khasra No-154, Proposed Production capacity-1,41,217 TPA (ROM)(Saleable Mineral-1,38,388 & Waste-2824 TPA), Located Near Village – Ratanpura, Tehsil-Atru & District-Baran (Raj.) in favor of M/s Shree Ram Buildcom R/o- Bijli Ghar ke Pass, Hat Chowk, Tehsil-Atru, District-Baran 325218 (Raj.), under Category-B-2.

Proposed Masonry Stone Mining Project, M.L.-05/2024, Applied (L.O.I) Area-1.1386 Hectare, Khasra No-154, Proposed Production capacity-1,41,217 TPA (ROM)(Saleable Mineral-1,38,388 & Waste-2824 TPA), Located Near Village – Ratanpura, Tehsil-Atru & District-Baran (Raj.) in favor of M/s Shree Ram Buildcom R/o- Bijli Ghar ke Pass, Hat Chowk, Tehsil-Atru, District-Baran 325218 (Raj.), under Category-B-2 is a proposed mining project in Ratanpura, Atru, Baran, Rajasthan. The site covers 2.8 acres. Its stated project cost is ₹2 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 25 Nov 2026).

See it on the live map All projects in Baran

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Masonry Stone Mining Project, M.L.-05/2024, Applied (L.O.I) Area-1.1386 Hectare, Khasra No-154, Proposed Production capacity-1,41,217 TPA (ROM)(Saleable Mineral-1,38,388 & Waste-2824 TPA), Located Near Village – Ratanpura, Tehsil-Atru & District-Baran (Raj.) in favor of M/s Shree Ram Buildcom R/o- Bijli Ghar ke Pass, Hat Chowk, Tehsil-Atru, District-Baran 325218 (Raj.), under Category-B-2 is a proposed mining project in Ratanpura, Atru, Baran, Rajasthan. The site covers 2.8 acres.

Who is building it?

The applicant is Shree Ram Buildcom.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Ratanpura, Atru, Baran, Rajasthan.

How big is it?

It has a stated cost of ₹2 crore and a site of 2.8 acres.

When was it filed?

The application was filed on 20 Feb 2026.

Project details

StatusUnder environmental review
Status since25 Nov 2026
Application filed20 Feb 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantShree Ram Buildcom
Land area2.8 acres (1.1 ha)
Project cost₹2 crore
Village / localityRatanpura
Taluk / tehsilAtru
DistrictBaran
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-32824

In context

82 applications in Baran since January 2022 are in the same category (Mining): 47 approved, 14 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.8 acres, this one is larger than 69% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Ratanpura, Atru, Baran, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shree Ram Buildcom in Baran

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.