Quick answers
What is this project?
Proposed 200 KLPD Grain based Ethanol Plant & 5.0 MW Cogeneration Power Plant under Ethanol Blending Programme by M/s. Bharat Bioethanol Private Limited is an approved industrial project in Chak 27 Amp, Sangaria, Hanumangarh, Rajasthan. The site covers 26.4 acres.
Who is building it?
The applicant is Bharat Bioethanol Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Aug 2024), as of 27 Nov 2026.
Where is it?
In Chak 27 Amp, Sangaria, Hanumangarh, Rajasthan.
How big is it?
It has a stated cost of ₹235 crore and a site of 26.4 acres.
When was it filed?
The application was filed on 6 May 2024.
Project details
| Official title | Proposed 200 KLPD Grain based Ethanol Plant & 5.0 MW Cogeneration Power Plant under Ethanol Blending Programme at Village 27 AMP, Tehsil Sangariya, District Hanumangarh, Rajasthan by M/s. Bharat Bioethanol Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 Aug 2024 |
| Application filed | 6 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Bharat Bioethanol Private Limited |
| Land area | 26.4 acres (10.7 ha) |
| Project cost | ₹235 crore |
| Village / locality | Chak 27 Amp |
| Taluk / tehsil | Sangaria |
| District | Hanumangarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-09984 |
In context
13 applications in Hanumangarh since January 2022 are in the same category (Industry): 12 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 26.4 acres, this one is larger than 85% of them.
Where it is
Chak 27 Amp, Sangaria, Hanumangarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Design,construction,maintenance and Operation of Processing Plant and… — more information requested, 21.6 km away
- Expansion of Hydrazine Hydrate & Azodicarbonamide manufacturing unit by S S… — environmental approval granted, 22.7 km away
- Expansion of Hydrazine Hydrate & Azodicarbonamide manufacturing unit — environmental approval granted, 22.7 km away
- Expansion of Hydrazine Hydrate & Azodicarbonamide manufacturing unit — cleared for impact study, 22.7 km away
- Expansion of existing unit from 360 TPA to 720 TPA for manufacturing of… — lapsed, 22.8 km away
- Expansion of existing unit from 360 TPA to 720 TPA for manufacturing of… — cleared for impact study, 22.8 km away
- Industrial project by KSRK Chemicals Pvt. Ltd. — environmental approval granted, 22.8 km away
- Industrial project by KSRK Chemicals Pvt. Ltd. — environmental approval granted, 22.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.