Quick answers
What is this project?
Proposed Ramgarh Auctioned Block for Limestone mineral over an area of 256.00 Ha is a proposed mining project in Ramgarh, Jaisalmer, Rajasthan. The site covers 632.6 acres.
Who is building it?
The applicant is Dalmia Bharat Green Vision Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 2 Sept 2024), as of 27 Nov 2026.
Where is it?
In Ramgarh, Jaisalmer, Rajasthan.
How big is it?
It has a stated cost of ₹58.1 crore and a site of 632.6 acres.
When was it filed?
The application was filed on 24 Apr 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Ramgarh Auctioned Block for Limestone mineral over an area of 256.00 Ha
Project details
| Official title | Proposed Ramgarh Auctioned Block for Limestone mineral over an area of 256.00 Ha. located at Village-Ramgarh, Tehsil & District-Jaisalmer of Rajasthan State of M/s Dalmia Bharat Green Vision Limited. |
|---|---|
| Status | Cleared for impact study |
| Status since | 2 Sept 2024 |
| Application filed | 24 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Dalmia Bharat Green Vision Limited |
| Land area | 632.6 acres (256 ha) |
| Project cost | ₹58.1 crore |
| Village / locality | Ramgarh |
| Taluk / tehsil | Jaisalmer |
| District | Jaisalmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-13901 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Jun 2026 | Environmental approval granted | 632.6 acres | ₹58.1 crore |
| Early planning filed 24 Apr 2024 (this page) | Cleared for impact study | 632.6 acres | ₹58.1 crore |
In context
575 applications in Jaisalmer since January 2022 are in the same category (Mining): 231 approved, 103 filed or under review, and 241 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 632.6 acres, this one is larger than 92% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Ramgarh, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Ramgarh Auctioned Block for Limestone mineral over an area of 256.00 Ha — environmental approval granted, 0 m away
- Clinkerization and Cement Manufacturing Plant by Dalmia Bharat Green Vision Ltd — environmental approval granted, 2.2 km away
- Proposed Integrated Cement Project: Clinker - 8.0 Million TPA (2 x 4.0 Million… — withdrawn, 2.2 km away
- Clinkerization and Cement Manufacturing Plant by Dalmia Bharat Green Vision Ltd — cleared for impact study, 2.2 km away
- Expansion of Sanu-I Limestone Mining Project (ML No. 27/1996, Area-1000 Ha.)… — environmental approval granted, 8.5 km away
- Expansion of Sanu-I Limestone Mining Project (ML No. 27/1996, Area-1000 Ha.)… — environmental approval granted, 8.5 km away
- Joga-I Limestone Block (Area: 384.00 Ha) with Proposed Limestone Production… — under environmental review, 9.4 km away
- Joga-I Limestone Block (Area: 384.00 Ha) with Proposed Limestone Production… — under environmental review, 9.4 km away
More from Dalmia Bharat Green Vision Limited in Jaisalmer
- Clinkerization and Cement Manufacturing Plant by Dalmia Bharat Green Vision Ltd — environmental approval granted
- Proposed Integrated Cement Project: Clinker - 8.0 Million TPA (2 x 4.0 Million… — withdrawn
- Clinkerization and Cement Manufacturing Plant by Dalmia Bharat Green Vision Ltd — cleared for impact study
5 Dalmia Bharat Green Vision projects in Jaisalmer
All 14 Dalmia Bharat Green Vision projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.