WithdrawnIndustry · Jaisalmer, Rajasthan

Proposed Integrated Cement Project: Clinker - 8.0 Million TPA (2 x 4.0 Million TPA), Cement - 5.0 Million TPA (2 x 2.5 Million TPA), WHRS - 40 MW (2 x 20 MW), DG Sets Capacity- 3000 KVA (4 X 750 or 3 X1000 KVA), Oxygen Plant 160 m3/hr (2 X 80 m3/hr) capacity AFR Pre-Processing/Co-processing facility and Railway siding with wagon tippler etc by Dalmia Bharat Green Vision Ltd

Proposed Integrated Cement Project: Clinker - 8.0 Million TPA (2 x 4.0 Million TPA), Cement - 5.0 Million TPA (2 x 2.5 Million TPA), WHRS - 40 MW (2 x 20 MW), DG Sets Capacity- 3000 KVA (4 X 750 or 3 X1000 KVA), Oxygen Plant 160 m3/hr (2 X 80 m3/hr) capacity AFR Pre-Processing/Co-processing facility and Railway siding with wagon tippler etc by Dalmia Bharat Green Vision Ltd is a withdrawn industrial project in Ramgarh, Jaisalmer, Rajasthan. The site covers 300 acres. Its stated project cost is ₹2,500 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 24 Jun 2025).

See it on the live map All projects in Jaisalmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Integrated Cement Project: Clinker - 8.0 Million TPA (2 x 4.0 Million TPA), Cement - 5.0 Million TPA (2 x 2.5 Million TPA), WHRS - 40 MW (2 x 20 MW), DG Sets Capacity- 3000 KVA (4 X 750 or 3 X1000 KVA), Oxygen Plant 160 m3/hr (2 X 80 m3/hr) capacity AFR Pre-Processing/Co-processing facility and Railway siding with wagon tippler etc by Dalmia Bharat Green Vision Ltd is a withdrawn industrial project in Ramgarh, Jaisalmer, Rajasthan. The site covers 300 acres.

Who is building it?

The applicant is Dalmia Bharat Green Vision Limited.

Has it been approved?

No. The application was withdrawn on 24 Jun 2025, so it is no longer under consideration.

Where is it?

In Ramgarh, Jaisalmer, Rajasthan.

How big is it?

It has a stated cost of ₹2,500 crore and a site of 300 acres.

When was it filed?

The application was filed on 24 Jun 2025.

Project details

Official titleProposed Integrated Cement Project: Clinker - 8.0 Million TPA (2 x 4.0 Million TPA), Cement - 5.0 Million TPA (2 x 2.5 Million TPA), WHRS - 40 MW (2 x 20 MW), DG Sets Capacity- 3000 KVA (4 X 750 or 3 X1000 KVA), Oxygen Plant 160 m3/hr (2 X 80 m3/hr) capacity AFR Pre-Processing/Co-processing facility and Railway siding with wagon tippler etc. at Village Ramgarh, Tehsil Ramgarh, District Jaisalmer, Rajasthan by Dalmia Bharat Green Vision Ltd.
StatusWithdrawn
Status since24 Jun 2025
Application filed24 Jun 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantDalmia Bharat Green Vision Limited
Land area300 acres (121.4 ha)
Project cost₹2,500 crore
Village / localityRamgarh
Taluk / tehsilJaisalmer
DistrictJaisalmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-21360

In context

9 applications in Jaisalmer since January 2022 are in the same category (Industry): 6 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ramgarh, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dalmia Bharat Green Vision Limited in Jaisalmer

5 Dalmia Bharat Green Vision projects in Jaisalmer
All 14 Dalmia Bharat Green Vision projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.