Clinkerization and Cement Manufacturing Plant by Dalmia Bharat Green Vision Ltd is an approved industrial project in Ramgarh, Jaisalmer, Rajasthan. The site covers 300 acres.
Who is building it?
The applicant is Dalmia Bharat Green Vision Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Sept 2026), as of 27 Nov 2026.
Where is it?
In Ramgarh, Jaisalmer, Rajasthan.
How big is it?
It has a stated cost of ₹2,500 crore and a site of 300 acres.
When was it filed?
The application was filed on 13 Jul 2026.
Project details
| Official title | Establishment of Clinkerization and Cement Manufacturing Plant along with associated facilities at Village Ramgarh, Tehsil Ramgarh, District Jaisalmer, Rajasthan by Dalmia Bharat Green Vision Ltd. |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 Sept 2026 |
| Application filed | 13 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Dalmia Bharat Green Vision Limited |
| Land area | 300 acres (121.4 ha) |
| Project cost | ₹2,500 crore |
| Village / locality | Ramgarh |
| Taluk / tehsil | Jaisalmer |
| District | Jaisalmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33771 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jul 2026 (this page) | Environmental approval granted | 300 acres | ₹2,500 crore |
| Early planning filed 24 Jun 2025 | Cleared for impact study | 300 acres | ₹2,500 crore |
In context
9 applications in Jaisalmer since January 2022 are in the same category (Industry): 6 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ramgarh, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Cement Project: Clinker - 8.0 Million TPA (2 x 4.0 Million… — withdrawn, 0 m away
- Clinkerization and Cement Manufacturing Plant by Dalmia Bharat Green Vision Ltd — cleared for impact study, 0 m away
- Proposed Ramgarh Auctioned Block for Limestone mineral over an area of 256.00 Ha — environmental approval granted, 2.2 km away
- Proposed Ramgarh Auctioned Block for Limestone mineral over an area of 256.00 Ha — cleared for impact study, 2.2 km away
- Expansion of Sanu-I Limestone Mining Project (ML No. 27/1996, Area-1000 Ha.)… — environmental approval granted, 7.8 km away
- Expansion of Sanu-I Limestone Mining Project (ML No. 27/1996, Area-1000 Ha.)… — environmental approval granted, 7.8 km away
- 400 kV S/C Overhead Transmission Line from proposed 400KV PSS of M/s Adani… — more information requested, 8.9 km away
- Joga-I Limestone Block (Area: 384.00 Ha) with Proposed Limestone Production… — under environmental review, 9.6 km away
More from Dalmia Bharat Green Vision Limited in Jaisalmer
- Proposed Ramgarh Auctioned Block for Limestone mineral over an area of 256.00 Ha — environmental approval granted
- Proposed Integrated Cement Project: Clinker - 8.0 Million TPA (2 x 4.0 Million… — withdrawn
- Proposed Ramgarh Auctioned Block for Limestone mineral over an area of 256.00 Ha — cleared for impact study
5 Dalmia Bharat Green Vision projects in Jaisalmer
All 14 Dalmia Bharat Green Vision projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.