What is this project?
"Existing Quartz & Feldspar Mining Project, ML No.- 06/1990", with Expansion in Production Capacity from 20,000 TPA to 9,82,713 TPA (ROM), Area- 13.1718 Ha by Shri Naveen Yadav S/o Shri Hemchand Yadav is a proposed mining project in Piplaj, Masuda, Ajmer, Rajasthan. The site covers 32.5 acres.
Who is building it?
The applicant is Naveen Yadav.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Feb 2025), as of 27 Nov 2026.
Where is it?
In Piplaj, Masuda, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹10.5 crore and a site of 32.5 acres.
When was it filed?
The application was filed on 10 Feb 2025.
Project details
| Official title | "Existing Quartz & Feldspar Mining Project, ML No.- 06/1990", with Expansion in Production Capacity from 20,000 TPA to 9,82,713 TPA (ROM), Area- 13.1718 Ha, at Near Village- Piplaj, Tehsil- Masuda, District- Beawar (Rajasthan) by Shri Naveen Yadav S/o Shri Hemchand Yadav. |
|---|---|
| Status | Cleared for impact study |
| Status since | 18 Feb 2025 |
| Application filed | 10 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Naveen Yadav |
| Land area | 32.5 acres (13.2 ha) |
| Project cost | ₹10.5 crore |
| Village / locality | Piplaj |
| Taluk / tehsil | Masuda |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-16316 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 32.5 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 29 have applied within 5 km.
Where it is
Piplaj, Masuda, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- EC Transfer of Existing Quartz & Feldspar Mining Project (Production Capacity… — environmental approval granted, 0 m away
- "Reappraisal of the EC granted by DEIAA Ajmer for Quartz and Feldspar Mining… — environmental approval granted, 1.4 km away
- Reappraisal of Earlier Granted EC by DEIAA, (Raj.) with Production Capacity… — environmental approval granted, 1.6 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — environmental approval granted, 2.2 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — withdrawn, 2.2 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — environmental approval granted, 2.6 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — withdrawn, 2.6 km away
- This is a Fresh proposal for "Quartz & Feldspar (Major Mineral) mining… — under environmental review, 2.8 km away
More from Naveen Yadav in Ajmer
- EC Transfer of Existing Quartz & Feldspar Mining Project (Production Capacity… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.